Install EV Chargers in Peoria, Illinois

Install EV chargers or analyze a site in Peoria, Illinois. 18 existing public charging locations (5 DC fast, 13 Level 2). Free 0–100 profitability score on any Peoria address from EV Data Map by Charge Rigs.

Peoria, Illinois is served by 18 public electric vehicle charging locations operating 46 individual chargers — an average of 2.6 chargers per site. Of those locations, 5 (28%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (72%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Peoria is ChargePoint Network with 8 locations, followed by Non-Networked with 4. Average DC fast power across the city is approximately 138 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Peoria and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Peoria

Peoria's EV charging landscape is characterized by an impressive diversity of operators and power options, boasting 18 public charging locations managed by six distinct networks. With ChargePoint Network leading the way at 44% of these sites, the competition fosters favorable pricing and reliable uptime for users. The city's 5 DC fast charging locations average 138 kW, with notable speed provided by a stall reaching 250 kW, and 40% of these fast stations are 150 kW-class or higher. This mid-power range, combined with the alternative Level 2 options, allows drivers to strategically choose based on their needs, making Peoria an appealing stop for EV users navigating the region. Availability is enhanced with roughly 20 DC fast ports citywide, supported by a robust infrastructure that addresses local traffic and demographics.

Peoria charging by the numbers

Locations
18
Chargers
46
DC Fast locations
5
Level 2 locations
13

DC fast share: 28% of locations. Level 2 share: 72%. Average chargers per site: 2.6. Average DC fast power: 138 kW.

Peoria charging — local snapshot

Top operator share
ChargePoint Network runs 44% of public locations across 6 networks.
Average DC fast power
138 kW (fastest stall: 250 kW)
High-power share
40% of DC fast sites are 150 kW-class or higher
Mix
28% DC fast / 72% Level 2 across 18 locations
Estimated DC ports
20 fast-charging ports city-wide

Charging networks in Peoria

The following operators run public charging in Peoria, ranked by number of locations.

Featured charging locations in Peoria

A selection of higher-power public charging locations across Peoria, sorted by power level.

  1. Hy-Vee Peoria - Tesla Supercharger — Peoria, IL, 61614 (Tesla · DC Fast · 250 kW)
  2. PEORIA FORD FORDSERVICE PL — Peoria, IL, 61615 (ChargePoint Network · DC Fast · 200 kW)
  3. Edn Hotel — Peoria, IL, 61614 (UNIVERSAL · DC Fast · 90 kW)
  4. Shell — Peoria, IL, 61615 (UNIVERSAL · DC Fast · 90 kW)
  5. Jim McComb Chevrolet — Peoria, IL, 61614 (Blink Network · DC Fast · 60 kW)
  6. LEXUS OF PEORIA LEXUS — Peoria, IL, 61614 (ChargePoint Network · Level 2 · 19.2 kW)
  7. Bob Linsday Acura — Peoria, IL, 61614 (Blink Network · Level 2 · 17.3 kW)
  8. PEORIA MITSUBIS MITSUBISHI — Peoria, IL, 61615 (ChargePoint Network · Level 2 · 15.4 kW)
  9. Mike Miller Mitsubishi — Peoria, IL, 61615 (Non-Networked · Level 2 · 7.2 kW)
  10. Peoria Riverfront Museum — Peoria, IL, 61602 (Non-Networked · Level 2 · 7.2 kW)
  11. Uftring Nissan — Peoria, IL, 61614 (Non-Networked · Level 2 · 7.2 kW)
  12. One Technology Plaza Paking Deck - Tesla Destination — Peoria, IL, 61602 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Illinois we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Peoria specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Peoria, Illinois?
There are 18 public electric vehicle charging locations in Peoria, Illinois, with a combined 46 individual chargers. 5 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Peoria?
ChargePoint Network operates the most public charging locations in Peoria with 8 sites, followed by Non-Networked with 4 sites.
How much does it cost to install an EV charger in Peoria?
Level 2 EV chargers in Peoria typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Peoria?
Most Peoria projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Illinois state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Peoria?
A typical commercial Level 2 installation in Peoria energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Peoria take to become profitable?
Payback in Peoria depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.