Install EV Chargers in Kokomo, Indiana

Install EV chargers or analyze a site in Kokomo, Indiana. 12 existing public charging locations (4 DC fast, 8 Level 2). Free 0–100 profitability score on any Kokomo address from EV Data Map by Charge Rigs.

Kokomo, Indiana is served by 12 public electric vehicle charging locations operating 30 individual chargers — an average of 2.5 chargers per site. Of those locations, 4 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Kokomo is FLO with 6 locations, followed by EV Connect with 2. Average DC fast power across the city is approximately 136 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Kokomo and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Kokomo

Kokomo offers a uniquely competitive public charging environment with 12 charging locations spread across 6 distinct networks, led by FLO, which operates half of these sites. This variety enhances competition on pricing and uptime while allowing drivers to choose based on power and amenities rather than brand preference. With 33% of the locations dedicated to DC fast charging, the fleet's average power stands at 136 kW, featuring several high-capacity stations—50% are classified at 150 kW or higher, making them attractive options for drivers relying on navigation apps to find optimal charging stops. This combination of mid-power fast charging and diverse operator presence positions Kokomo as a robust hub for EV charging in the region.

Kokomo charging by the numbers

Locations
12
Chargers
30
DC Fast locations
4
Level 2 locations
8

DC fast share: 33% of locations. Level 2 share: 67%. Average chargers per site: 2.5. Average DC fast power: 136 kW.

Kokomo charging — local snapshot

Top operator share
FLO runs 50% of public locations across 6 networks.
Average DC fast power
136 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
33% DC fast / 67% Level 2 across 12 locations
Estimated DC ports
15 fast-charging ports city-wide

Charging networks in Kokomo

The following operators run public charging in Kokomo, ranked by number of locations.

Featured charging locations in Kokomo

A selection of higher-power public charging locations across Kokomo, sorted by power level.

  1. Meijer - Tesla Supercharger — Kokomo, IN, 46901 (Tesla · DC Fast · 250 kW)
  2. Kokomo — Kokomo, IN, 46901 (EV Connect · DC Fast · 180 kW)
  3. KOKOMO TOYOTA CUST1CPE250 — Kokomo, IN, 46902 (ChargePoint Network · DC Fast · 62.5 kW)
  4. Mcgonigal — KOKOMO, IN, 46901 (EV Connect · DC Fast · 50 kW)
  5. Brad Howell Ford — Kokomo, IN, 46902 (RED_E · Level 2 · 19.2 kW)
  6. Greater Kokomo Economic Development Alliance — KOKOMO, IN, 46902 (Blink Network · Level 2 · 16.6 kW)
  7. DCC US - City of Kokomo - Downtown Dog Park — Kokomo, IN, 46901 (FLO · Level 2 · 10 kW)
  8. DCC US - City of Kokomo - Championship Park — Kokomo, IN, 46901 (FLO · Level 2 · 10 kW)
  9. DCC US - City of Kokomo - Highland Park playground parking — Kokomo, IN, 46902 (FLO · Level 2 · 10 kW)
  10. DCC US - City of Kokomo - Northwest Park — Kokomo, IN, 46901 (FLO · Level 2 · 10 kW)
  11. DCC US - City of Kokomo - Downtown Parking Garage — Kokomo, IN, 46901 (FLO · Level 2 · 6.2 kW)
  12. City of Kokomo - Superior Street Parking Garage — Kokomo, IN, 46901 (FLO · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Indiana we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Kokomo specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Kokomo, Indiana?
There are 12 public electric vehicle charging locations in Kokomo, Indiana, with a combined 30 individual chargers. 4 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Kokomo?
FLO operates the most public charging locations in Kokomo with 6 sites, followed by EV Connect with 2 sites.
How much does it cost to install an EV charger in Kokomo?
Level 2 EV chargers in Kokomo typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Kokomo?
Most Kokomo projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Indiana state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Kokomo?
A typical commercial Level 2 installation in Kokomo energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Kokomo take to become profitable?
Payback in Kokomo depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage