Install EV Chargers in Mishawaka, Indiana

Install EV chargers or analyze a site in Mishawaka, Indiana. 16 existing public charging locations (8 DC fast, 8 Level 2). Free 0–100 profitability score on any Mishawaka address from EV Data Map by Charge Rigs.

Mishawaka, Indiana is served by 16 public electric vehicle charging locations operating 44 individual chargers — an average of 2.8 chargers per site. Of those locations, 8 (50%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (50%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Mishawaka is ChargePoint Network with 7 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 129 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Mishawaka and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Mishawaka

Mishawaka boasts a competitive public charging landscape with 16 locations shared across seven operators, including ChargePoint Network, which accounts for nearly half of the sites. This variety enhances pricing options and uptime reliability, giving drivers the flexibility to choose based on charging speed and amenities. With DC fast chargers averaging 129 kW and a notable 38% rated at 150 kW or higher, the city meets both quick charging needs and longer-stay options, essential for diverse driver preferences. Additionally, the presence of the fastest stall at 350 kW positions Mishawaka as a key player in the region's charging ecosystem, offering significant advantages to EV users navigating local and neighboring cities.

Mishawaka charging by the numbers

Locations
16
Chargers
44
DC Fast locations
8
Level 2 locations
8

DC fast share: 50% of locations. Level 2 share: 50%. Average chargers per site: 2.8. Average DC fast power: 129 kW.

Mishawaka charging — local snapshot

Top operator share
ChargePoint Network runs 44% of public locations across 7 networks.
Average DC fast power
129 kW (fastest stall: 350 kW)
High-power share
38% of DC fast sites are 150 kW-class or higher
Mix
50% DC fast / 50% Level 2 across 16 locations
Estimated DC ports
27 fast-charging ports city-wide

Charging networks in Mishawaka

The following operators run public charging in Mishawaka, ranked by number of locations.

Featured charging locations in Mishawaka

A selection of higher-power public charging locations across Mishawaka, sorted by power level.

  1. University Park Mall (Mishawaka, IN) — Mishawaka, IN, 46545 (Electrify America · DC Fast · 350 kW)
  2. Meijer - Tesla Supercharger — Mishawaka, IN, 46545 (Tesla · DC Fast · 250 kW)
  3. University Park Mall - Tesla Supercharger — Mishawaka, IN, 46545 (Tesla · DC Fast · 150 kW)
  4. GURLEY LEEP GM GL GM GIANT — Mishawaka, IN, 46545 (ChargePoint Network · DC Fast · 62.5 kW)
  5. GURLEY LEEP INC AMP UP — Mishawaka, IN, 46545 (ChargePoint Network · DC Fast · 62.5 kW)
  6. GL HYU SUB GL HYUNDAI 1 — Mishawaka, IN, 46545 (ChargePoint Network · DC Fast · 62.5 kW)
  7. GL HYU SUB GL HYUNDAI 2 — Mishawaka, IN, 46545 (ChargePoint Network · DC Fast · 62.5 kW)
  8. Basney Honda — Mishawaka, IN, 46545 (Blink Network · DC Fast · 30 kW)
  9. Jordan Ford — Mishawaka, IN, 46545 (RED_E · Level 2 · 19.2 kW)
  10. Gurley Leep Motorwerks — Mishawaka, IN, 46545 (Non-Networked · Level 2 · 7.2 kW)
  11. Lippert Plaza — Mishawaka, IN, 46545 (AMPUP · Level 2 · 7.2 kW)
  12. Gurley Leep Nissan — Mishawaka, IN, 46545 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Indiana we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Mishawaka specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Mishawaka, Indiana?
There are 16 public electric vehicle charging locations in Mishawaka, Indiana, with a combined 44 individual chargers. 8 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Mishawaka?
ChargePoint Network operates the most public charging locations in Mishawaka with 7 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Mishawaka?
Level 2 EV chargers in Mishawaka typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Mishawaka?
Most Mishawaka projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Indiana state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Mishawaka?
A typical commercial Level 2 installation in Mishawaka energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Mishawaka take to become profitable?
Payback in Mishawaka depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.