Install EV Chargers in South Bend, Indiana

Install EV chargers or analyze a site in South Bend, Indiana. 16 existing public charging locations (1 DC fast, 15 Level 2). Free 0–100 profitability score on any South Bend address from EV Data Map by Charge Rigs.

South Bend, Indiana is served by 16 public electric vehicle charging locations operating 44 individual chargers — an average of 2.8 chargers per site. Of those locations, 1 (6%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 15 (94%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in South Bend is ChargePoint Network with 7 locations, followed by FLO with 3. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in South Bend and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in South Bend

South Bend showcases a competitive public EV charging landscape with 16 locations powered by six distinct operators, ensuring a diverse range of choices for drivers. ChargePoint Network dominates with 44% of sites, promoting competitive pricing and uptime. Unique to this market is the ultra-fast DC fast charging option, with one location averaging 250 kW and all fast chargers rated at 150 kW or higher—well above national norms. This allows EV users to prioritize power and convenience over brand loyalty, particularly as new entrants roll out hardware between 150–350 kW. While 6% of public sites are DC fast, the remaining Level 2 stations cater to longer parking durations, making the infrastructure adaptable to varied driving patterns and needs.

South Bend charging by the numbers

Locations
16
Chargers
44
DC Fast locations
1
Level 2 locations
15

DC fast share: 6% of locations. Level 2 share: 94%. Average chargers per site: 2.8. Average DC fast power: 250 kW.

South Bend charging — local snapshot

Top operator share
ChargePoint Network runs 44% of public locations across 6 networks.
Average DC fast power
250 kW (fastest stall: 250 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
6% DC fast / 94% Level 2 across 16 locations
Estimated DC ports
12 fast-charging ports city-wide

Charging networks in South Bend

The following operators run public charging in South Bend, ranked by number of locations.

Featured charging locations in South Bend

A selection of higher-power public charging locations across South Bend, sorted by power level.

  1. Eddy Street Commons Parking Garage - Tesla Supercharger — South Bend, IN, 46617 (Tesla · DC Fast · 250 kW)
  2. Notre Dame - Innovation Park — South Bend, IN, 46617 (Non-Networked · Level 2 · 7.2 kW)
  3. LaSalle Grill - Tesla Destination — South Bend, IN, 46601 (Tesla Destination · Level 2 · 7.2 kW)
  4. City of South Bend - Veterans Memorial Park — South Bend, IN, 46615 (FLO · Level 2 · 7.2 kW)
  5. Inn at Saint Mary's - Tesla Destination — South Bend, IN, 46637 (Tesla Destination · Level 2 · 7.2 kW)
  6. City of South Bend Howard Park — South Bend, IN, 46617 (ZEFNET · Level 2 · 6.9 kW)
  7. Potawatomi Zoo — South Bend, IN, 46615 (ZEFNET · Level 2 · 6.7 kW)
  8. FW CASINO PG 2ND FLOOR — South Bend, IN, 46614 (ChargePoint Network · Level 2 · 6.5 kW)
  9. FW CASINO PG 4TH FLOOR — South Bend, IN, 46614 (ChargePoint Network · Level 2 · 6.5 kW)
  10. FW CASINO PG 1ST FLOOR — South Bend, IN, 46614 (ChargePoint Network · Level 2 · 6.5 kW)
  11. FW CASINO PG 3RD FLOOR — South Bend, IN, 46614 (ChargePoint Network · Level 2 · 6.5 kW)
  12. FW CASINO HOTEL PL SOUTH — South Bend, IN, 46614 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Indiana we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For South Bend specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 15 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in South Bend, Indiana?
There are 16 public electric vehicle charging locations in South Bend, Indiana, with a combined 44 individual chargers. 1 locations offer DC fast charging and 15 provide Level 2 charging.
What is the largest EV charging network in South Bend?
ChargePoint Network operates the most public charging locations in South Bend with 7 sites, followed by FLO with 3 sites.
How much does it cost to install an EV charger in South Bend?
Level 2 EV chargers in South Bend typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in South Bend?
Most South Bend projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Indiana state, utility and NEVI-funded programs.
How long does it take to install an EV charger in South Bend?
A typical commercial Level 2 installation in South Bend energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in South Bend take to become profitable?
Payback in South Bend depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.