Install EV Chargers in Lenexa, Kansas

Install EV chargers or analyze a site in Lenexa, Kansas. 46 existing public charging locations (1 DC fast, 45 Level 2). Free 0–100 profitability score on any Lenexa address from EV Data Map by Charge Rigs.

Lenexa, Kansas is served by 46 public electric vehicle charging locations operating 103 individual chargers — an average of 2.2 chargers per site. Of those locations, 1 (2%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 45 (98%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Lenexa is ChargePoint Network with 41 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 325 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lenexa and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Lenexa

Lenexa, Kansas, presents a unique opportunity in the EV charging landscape, with ChargePoint Network dominating the scene, operating 89% of the city's 45 public charging locations. The city boasts a single DC fast charging station, providing an impressive average output of 325 kW, marking it as one of the fastest in the area. With all DC fast sites classified as 150 kW and above, these ultra-fast chargers offer a competitive edge for operators seeking to attract drivers using navigation apps. While only 2% of installations are DC fast, the predominance of Level 2 stations caters to longer dwell times. An analysis of local traffic patterns and demographics can highlight strategic gaps for new infrastructure development in this focused market.

Lenexa charging by the numbers

Locations
46
Chargers
103
DC Fast locations
1
Level 2 locations
45

DC fast share: 2% of locations. Level 2 share: 98%. Average chargers per site: 2.2. Average DC fast power: 325 kW.

Lenexa charging — local snapshot

Top operator share
ChargePoint Network runs 89% of public locations across 5 networks.
Average DC fast power
325 kW (fastest stall: 325 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
2% DC fast / 98% Level 2 across 46 locations
Estimated DC ports
12 fast-charging ports city-wide

Charging networks in Lenexa

The following operators run public charging in Lenexa, ranked by number of locations.

Featured charging locations in Lenexa

A selection of higher-power public charging locations across Lenexa, sorted by power level.

  1. Hy-Vee - Tesla Supercharger — Lenexa, KS, 66215 (Tesla · DC Fast · 325 kW)
  2. EV ARC 1722 — Lenexa, KS, 66214 (Blink Network · Level 2 · 7.2 kW)
  3. Civic Center Garage — Lenexa, KS, 66219 (SYNERGEV · Level 2 · 7.2 kW)
  4. Grinders Stonewall - Tesla Destination — Lenexa, KS, 66215 (Tesla Destination · Level 2 · 7.2 kW)
  5. EV ARC 1721 — Lenexa, KS, 66214 (Blink Network · Level 2 · 7.2 kW)
  6. KIEWIT RENNER #2 — Lenexa, KS, 66219 (ChargePoint Network · Level 2 · 6.5 kW)
  7. EVERGY @HEND ENG-185B — Lenexa, KS, 66214 (ChargePoint Network · Level 2 · 6.5 kW)
  8. EVERGY @SHMSN MED-255D — Lenexa, KS, 66227 (ChargePoint Network · Level 2 · 6.5 kW)
  9. EVERGY @EPA -174F — Lenexa, KS, 66219 (ChargePoint Network · Level 2 · 6.5 kW)
  10. EVERGY @EPA -174A — Lenexa, KS, 66219 (ChargePoint Network · Level 2 · 6.5 kW)
  11. EVERGY @HEND ENG-185A — Lenexa, KS, 66214 (ChargePoint Network · Level 2 · 6.5 kW)
  12. REFLECTIONSKS STATION 8 — Lenexa, KS, 66219 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Kansas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Lenexa specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 45 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Lenexa, Kansas?
There are 46 public electric vehicle charging locations in Lenexa, Kansas, with a combined 103 individual chargers. 1 locations offer DC fast charging and 45 provide Level 2 charging.
What is the largest EV charging network in Lenexa?
ChargePoint Network operates the most public charging locations in Lenexa with 41 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Lenexa?
Level 2 EV chargers in Lenexa typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Lenexa?
Most Lenexa projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Kansas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Lenexa?
A typical commercial Level 2 installation in Lenexa energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Lenexa take to become profitable?
Payback in Lenexa depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage