Install EV Chargers in Olathe, Kansas

Install EV chargers or analyze a site in Olathe, Kansas. 45 existing public charging locations (4 DC fast, 41 Level 2). Free 0–100 profitability score on any Olathe address from EV Data Map by Charge Rigs.

Olathe, Kansas is served by 45 public electric vehicle charging locations operating 101 individual chargers — an average of 2.2 chargers per site. Of those locations, 4 (9%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 41 (91%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Olathe is ChargePoint Network with 40 locations, followed by STAY_N_CHARGE with 1. Average DC fast power across the city is approximately 185 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Olathe and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Olathe

Olathe, Kansas offers a distinctive public charging landscape where ChargePoint Network commands a remarkable 89% share of the city’s 45 locations, making network reliability pivotal for any new entrant. While only 9% of the charging sites are DC fast, they boast an impressive average power of 185 kW, with half classified at 150 kW or greater, including a notable stall reaching up to 350 kW. This high-power capacity positions Olathe favorably for electric vehicle drivers seeking fast, efficient charging. Potential site developers should consider the concentration of DC fast charging and the reliance on a single operator when planning their infrastructure, as the existing network's strengths and weaknesses could significantly influence their market strategy.

Olathe charging by the numbers

Locations
45
Chargers
101
DC Fast locations
4
Level 2 locations
41

DC fast share: 9% of locations. Level 2 share: 91%. Average chargers per site: 2.2. Average DC fast power: 185 kW.

Olathe charging — local snapshot

Top operator share
ChargePoint Network runs 89% of public locations across 6 networks.
Average DC fast power
185 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
9% DC fast / 91% Level 2 across 45 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Olathe

The following operators run public charging in Olathe, ranked by number of locations.

Featured charging locations in Olathe

A selection of higher-power public charging locations across Olathe, sorted by power level.

  1. Berger Convenience — Olathe, KS, 66061 (eVgo Network · DC Fast · 350 kW)
  2. Hy-Vee - Tesla Supercharger — Olathe, KS, 66061 (Tesla · DC Fast · 150 kW)
  3. OFL STATION L3-1 — Olathe, KS, 66062 (ChargePoint Network · DC Fast · 120 kW)
  4. OFL STATION L3-2 — Olathe, KS, 66062 (ChargePoint Network · DC Fast · 120 kW)
  5. OFL STATION L2-2 — Olathe, KS, 66062 (ChargePoint Network · Level 2 · 19.2 kW)
  6. OFL STATION L2-1 — Olathe, KS, 66062 (ChargePoint Network · Level 2 · 19.2 kW)
  7. OFL STATION L2-3 — Olathe, KS, 66062 (ChargePoint Network · Level 2 · 19.2 kW)
  8. Stay-N-Charge EV Charging Station - Comfort Inn & Suites - Olathe - Kansas City — Olathe, KS, 66062 (STAY_N_CHARGE · Level 2 · 11.5 kW)
  9. Cendana Olathe Apartments — Olathe, KS, 66061 (Blink Network · Level 2 · 8.6 kW)
  10. McCarthy Olathe Nissan — Olathe, KS, 66061 (Non-Networked · Level 2 · 7.2 kW)
  11. EVERGY @WALMART -073A — Olathe, KS, 66062 (ChargePoint Network · Level 2 · 6.5 kW)
  12. EVERGY @JCCC -025B — Olathe, KS, 66062 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Kansas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Olathe specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 41 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Olathe, Kansas?
There are 45 public electric vehicle charging locations in Olathe, Kansas, with a combined 101 individual chargers. 4 locations offer DC fast charging and 41 provide Level 2 charging.
What is the largest EV charging network in Olathe?
ChargePoint Network operates the most public charging locations in Olathe with 40 sites, followed by STAY_N_CHARGE with 1 sites.
How much does it cost to install an EV charger in Olathe?
Level 2 EV chargers in Olathe typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Olathe?
Most Olathe projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Kansas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Olathe?
A typical commercial Level 2 installation in Olathe energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Olathe take to become profitable?
Payback in Olathe depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.