Install EV chargers or analyze a site in South Portland, Maine. 25 existing public charging locations (2 DC fast, 23 Level 2). Free 0–100 profitability score on any South Portland address from EV Data Map by Charge Rigs.
South Portland, Maine is served by 25 public electric vehicle charging locations operating 52 individual chargers — an average of 2.1 chargers per site. Of those locations, 2 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 23 (92%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in South Portland is ChargePoint Network with 12 locations, followed by Non-Networked with 7. Average DC fast power across the city is approximately 85 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in South Portland and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in South Portland
In South Portland, a diverse network of seven operators manages 25 public charging locations, fostering competitive pricing and uptime. ChargePoint Network dominates with nearly half of the sites, enabling drivers to choose based on power and amenities rather than brand loyalty. The city’s two DC fast chargers, averaging 85 kW with a peak of 120 kW, represent an older charging landscape, lacking higher capacity options typical of newer installations. This means that while 8% of South Portland's chargers provide fast access, the majority cater to longer dwell times with Level 2 options. Capitalizing on these insights can help site developers strategically address local demand and optimize charging investments.
South Portland charging by the numbers
Locations
25
Chargers
52
DC Fast locations
2
Level 2 locations
23
DC fast share: 8% of locations. Level 2 share: 92%. Average chargers per site: 2.1. Average DC fast power: 85 kW.
South Portland charging — local snapshot
Top operator share
ChargePoint Network runs 48% of public locations across 7 networks.
Average DC fast power
85 kW (fastest stall: 120 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 25 locations
Estimated DC ports
5 fast-charging ports city-wide
Charging networks in South Portland
The following operators run public charging in South Portland, ranked by number of locations.
ChargePoint Network — 12 locations
Non-Networked — 7 locations
Tesla Destination — 2 locations
SYNERGEV — 1 location
SWTCH — 1 location
FORD_CHARGE — 1 location
EV Connect — 1 location
Featured charging locations in South Portland
A selection of higher-power public charging locations across South Portland, sorted by power level.
Yankee Ford — South Portland, ME, 04106 (FORD_CHARGE · DC Fast · 120 kW)
City of South Portland - Community Center — South Portland, ME, 04106 (Non-Networked · DC Fast · 50 kW)
BETSY ROSS CHARGER 4 — South Portland, ME, 04106 (ChargePoint Network · Level 2 · 9.6 kW)
BETSY ROSS CHARGER 2 — South Portland, ME, 04106 (ChargePoint Network · Level 2 · 7.7 kW)
BETSY ROSS CHARGER 3 — South Portland, ME, 04106 (ChargePoint Network · Level 2 · 7.7 kW)
BETSY ROSS CHARGER 9 — South Portland, ME, 04106 (ChargePoint Network · Level 2 · 7.7 kW)
BETSY ROSS CHARGER 1 — South Portland, ME, 04106 (ChargePoint Network · Level 2 · 7.7 kW)
BETSY ROSS CHARGER 10 — South Portland, ME, 04106 (ChargePoint Network · Level 2 · 7.7 kW)
BETSY ROSS CHARGER 11 — South Portland, ME, 04106 (ChargePoint Network · Level 2 · 7.7 kW)
BETSY ROSS CHARGER 8 — South Portland, ME, 04106 (ChargePoint Network · Level 2 · 7.7 kW)
BETSY ROSS CHARGER 7 — South Portland, ME, 04106 (ChargePoint Network · Level 2 · 7.7 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For South Portland specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 23 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in South Portland, Maine?
There are 25 public electric vehicle charging locations in South Portland, Maine, with a combined 52 individual chargers. 2 locations offer DC fast charging and 23 provide Level 2 charging.
What is the largest EV charging network in South Portland?
ChargePoint Network operates the most public charging locations in South Portland with 12 sites, followed by Non-Networked with 7 sites.
How much does it cost to install an EV charger in South Portland?
Level 2 EV chargers in South Portland typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in South Portland?
Most South Portland projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Maine state, utility and NEVI-funded programs.
How long does it take to install an EV charger in South Portland?
A typical commercial Level 2 installation in South Portland energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in South Portland take to become profitable?
Payback in South Portland depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.