Install EV Chargers in Portland, Maine

Install EV chargers or analyze a site in Portland, Maine. 61 existing public charging locations (4 DC fast, 57 Level 2). Free 0–100 profitability score on any Portland address from EV Data Map by Charge Rigs.

Portland, Maine is served by 61 public electric vehicle charging locations operating 227 individual chargers — an average of 3.7 chargers per site. Of those locations, 4 (7%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 57 (93%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Portland is ChargePoint Network with 30 locations, followed by Non-Networked with 11. Average DC fast power across the city is approximately 244 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Portland and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Portland

Portland, Maine, offers a diverse public charging ecosystem with 61 locations across 12 distinct operators, enhancing competition and reliability for EV drivers. The city’s charging landscape includes four DC fast stations with an impressive average power of 244 kW, boasting the fastest site at 350 kW, which positions it well above national standards. With 100% of these fast-charging sites classified at 150 kW or higher, drivers can select from a potent range of ultra-fast options tailored to their needs. Meanwhile, the higher number of Level 2 chargers caters to longer-stay demands, making Portland's charging infrastructure not only robust but also strategically flexible for varying driver preferences.

Portland charging by the numbers

Locations
61
Chargers
227
DC Fast locations
4
Level 2 locations
57

DC fast share: 7% of locations. Level 2 share: 93%. Average chargers per site: 3.7. Average DC fast power: 244 kW.

Portland charging — local snapshot

Top operator share
ChargePoint Network runs 49% of public locations across 12 networks.
Average DC fast power
244 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
7% DC fast / 93% Level 2 across 61 locations
Estimated DC ports
32 fast-charging ports city-wide

Charging networks in Portland

The following operators run public charging in Portland, ranked by number of locations.

Featured charging locations in Portland

A selection of higher-power public charging locations across Portland, sorted by power level.

  1. High St. Lot — Portland, ME, 04101 (eVgo Network · DC Fast · 350 kW)
  2. Pine Tree Shopping Center - Tesla Supercharger — Portland, ME, 04102 (Tesla · DC Fast · 325 kW)
  3. Hannaford Supermarket - Tesla Supercharger — Portland, ME, 04101 (Tesla · DC Fast · 150 kW)
  4. Miss Portland Diner — Portland, ME, 04101 (JULE · DC Fast · 150 kW)
  5. Promenade Towers — Portland, ME, 04101 (RED_E · Level 2 · 19.2 kW)
  6. WEX EV Lab — Portland, ME, 04101 (Blink Network · Level 2 · 16.6 kW)
  7. TSL MML LEXUS BACK — Portland, ME, 04103 (ChargePoint Network · Level 2 · 12 kW)
  8. WEX HQ Lab Charger — Portland, ME, 04101 (VIALYNK · Level 2 · 11.5 kW)
  9. Sagamore Village — Portland, ME, 04102 (RED_E · Level 2 · 11.5 kW)
  10. Dougherty Commons — Portland, ME, 04102 (RED_E · Level 2 · 9.6 kW)
  11. Portland Foreside Development — Portland, ME, 04101 (Blink Network · Level 2 · 8.6 kW)
  12. GMPINC GMPINC-S2 — Portland, ME, 04101 (ChargePoint Network · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in Maine we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Portland specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 57 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Portland, Maine?
There are 61 public electric vehicle charging locations in Portland, Maine, with a combined 227 individual chargers. 4 locations offer DC fast charging and 57 provide Level 2 charging.
What is the largest EV charging network in Portland?
ChargePoint Network operates the most public charging locations in Portland with 30 sites, followed by Non-Networked with 11 sites.
How much does it cost to install an EV charger in Portland?
Level 2 EV chargers in Portland typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Portland?
Most Portland projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Maine state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Portland?
A typical commercial Level 2 installation in Portland energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Portland take to become profitable?
Payback in Portland depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage