Install EV Chargers in Acton, Massachusetts

Install EV chargers or analyze a site in Acton, Massachusetts. 26 existing public charging locations (5 DC fast, 21 Level 2). Free 0–100 profitability score on any Acton address from EV Data Map by Charge Rigs.

Acton, Massachusetts is served by 26 public electric vehicle charging locations operating 61 individual chargers — an average of 2.3 chargers per site. Of those locations, 5 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 21 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Acton is ChargePoint Network with 19 locations, followed by FLO with 3. Average DC fast power across the city is approximately 122 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Acton and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Acton

In Acton, Massachusetts, the EV charging landscape features a strong presence of ChargePoint Network, which manages 73% of the city’s 26 public charging locations, ensuring a reliable experience for users. With only 5 DC fast charging sites comprising 19% of the total, and an average power output of 122 kW, the offerings fall into the mid-range category, which may influence driver preferences for more powerful stations. As Acton’s charging infrastructure is primarily anchored by one operator, competitors can capitalize on this with high-powered options exceeding 150 kW, creating an opportunity to attract EV drivers seeking quicker charging solutions. The mix of available Level 2 chargers further illustrates the city’s adaptability to varied charging needs while outlining potential gaps for development.

Acton charging by the numbers

Locations
26
Chargers
61
DC Fast locations
5
Level 2 locations
21

DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 2.3. Average DC fast power: 122 kW.

Acton charging — local snapshot

Top operator share
ChargePoint Network runs 73% of public locations across 6 networks.
Average DC fast power
122 kW (fastest stall: 125 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 26 locations
Estimated DC ports
8 fast-charging ports city-wide

Charging networks in Acton

The following operators run public charging in Acton, ranked by number of locations.

Featured charging locations in Acton

A selection of higher-power public charging locations across Acton, sorted by power level.

  1. TOWN OF ACTON VETERANS FIELD1 — Acton, MA, 01720 (ChargePoint Network · DC Fast · 125 kW)
  2. TOWN OF ACTON VETERANS FIELD2 — Acton, MA, 01720 (ChargePoint Network · DC Fast · 125 kW)
  3. ACTONFORD PL-2-M — Acton, MA, 01720 (ChargePoint Network · DC Fast · 120 kW)
  4. ACTONFORD PL-1-L — Acton, MA, 01720 (ChargePoint Network · DC Fast · 120 kW)
  5. ACTONFORD PL-3-R — Acton, MA, 01720 (ChargePoint Network · DC Fast · 120 kW)
  6. ACTONFORD L2-3 — Acton, MA, 01720 (ChargePoint Network · Level 2 · 19.2 kW)
  7. ACTONFORD L2-2 — Acton, MA, 01720 (ChargePoint Network · Level 2 · 19.2 kW)
  8. ACTONFORD L2-1 — Acton, MA, 01720 (ChargePoint Network · Level 2 · 19.2 kW)
  9. Nagog Woods Community Corporation — Acton, MA, 1718 (Blink Network · Level 2 · 13 kW)
  10. Avalon Acton 2 — Acton, MA, 01720 (LOOP · Level 2 · 7.7 kW)
  11. Middle Lot — ACTON, MA, 01720 (CHARGELAB · Level 2 · 7.7 kW)
  12. Nara Park - 2 — Acton, MA, 02155 (FLO · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Acton specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 21 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Acton, Massachusetts?
There are 26 public electric vehicle charging locations in Acton, Massachusetts, with a combined 61 individual chargers. 5 locations offer DC fast charging and 21 provide Level 2 charging.
What is the largest EV charging network in Acton?
ChargePoint Network operates the most public charging locations in Acton with 19 sites, followed by FLO with 3 sites.
How much does it cost to install an EV charger in Acton?
Level 2 EV chargers in Acton typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Acton?
Most Acton projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Acton?
A typical commercial Level 2 installation in Acton energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Acton take to become profitable?
Payback in Acton depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.