Install EV Chargers in Concord, Massachusetts

Install EV chargers or analyze a site in Concord, Massachusetts. 19 existing public charging locations (1 DC fast, 18 Level 2). Free 0–100 profitability score on any Concord address from EV Data Map by Charge Rigs.

Concord, Massachusetts is served by 19 public electric vehicle charging locations operating 41 individual chargers — an average of 2.2 chargers per site. Of those locations, 1 (5%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 18 (95%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Concord is ChargePoint Network with 15 locations, followed by Non-Networked with 1. Average DC fast power across the city is approximately 100 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Concord and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Concord

In Concord, Massachusetts, the lion's share of public EV charging is concentrated within the ChargePoint Network, which operates 79% of the 19 charging locations. With only one DC fast charger in the city, averaging 100 kW, drivers may find themselves limited in rapid charging options, especially since no chargers exceed this power output. This mid-range capability may leave opportunities for new entrants with higher-power stations, typically ranging from 150 to 350 kW, to attract users seeking quicker charging experiences. Additionally, the predominance of Level 2 chargers indicates a strong demand for longer dwell-time charging, making it essential to analyze local traffic patterns and demographics to identify unfulfilled needs in the growing EV market.

Concord charging by the numbers

Locations
19
Chargers
41
DC Fast locations
1
Level 2 locations
18

DC fast share: 5% of locations. Level 2 share: 95%. Average chargers per site: 2.2. Average DC fast power: 100 kW.

Concord charging — local snapshot

Top operator share
ChargePoint Network runs 79% of public locations across 5 networks.
Average DC fast power
100 kW (fastest stall: 100 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
5% DC fast / 95% Level 2 across 19 locations
Estimated DC ports
2 fast-charging ports city-wide

Charging networks in Concord

The following operators run public charging in Concord, ranked by number of locations.

Featured charging locations in Concord

A selection of higher-power public charging locations across Concord, sorted by power level.

  1. Rideout Playground Park — Concord, MA, 01742 (FLO · DC Fast · 100 kW)
  2. Residence Inn by Marriott Boston Concord — Concord, MA, 01742 (LOOP · Level 2 · 7.7 kW)
  3. Walden Pond State Reservation — Concord, MA, 01742 (Non-Networked · Level 2 · 7.2 kW)
  4. Rectrix Aviation - Tesla Destination — Concord, MA, 01742 (Tesla Destination · Level 2 · 7.2 kW)
  5. CONCORD LIGHT KEYES RD LOT — Concord, MA, 01742 (ChargePoint Network · Level 2 · 6.5 kW)
  6. BAKER AVE 200 BAKER AVE 1 — Concord, MA, 01742 (ChargePoint Network · Level 2 · 6.5 kW)
  7. CONCORD LIGHT STOW STREET — Concord, MA, 01742 (ChargePoint Network · Level 2 · 6.5 kW)
  8. BRADFORD MILL STATION 3 — Concord, MA, 01742 (ChargePoint Network · Level 2 · 6.5 kW)
  9. BRADFORD MILL STATION 2 — Concord, MA, 01742 (ChargePoint Network · Level 2 · 6.5 kW)
  10. BRADFORD MILL STATION 4 — Concord, MA, 01742 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CONCORD LIGHT MBTA LOT NEW — Concord, MA, 01742 (ChargePoint Network · Level 2 · 6.5 kW)
  12. BAKER AVE 200 BAKER AVE 2 — Concord, MA, 01742 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Concord specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 18 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Concord, Massachusetts?
There are 19 public electric vehicle charging locations in Concord, Massachusetts, with a combined 41 individual chargers. 1 locations offer DC fast charging and 18 provide Level 2 charging.
What is the largest EV charging network in Concord?
ChargePoint Network operates the most public charging locations in Concord with 15 sites, followed by Non-Networked with 1 sites.
How much does it cost to install an EV charger in Concord?
Level 2 EV chargers in Concord typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Concord?
Most Concord projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Concord?
A typical commercial Level 2 installation in Concord energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Concord take to become profitable?
Payback in Concord depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage