Install EV Chargers in Bedford, Massachusetts

Install EV chargers or analyze a site in Bedford, Massachusetts. 23 existing public charging locations (0 DC fast, 23 Level 2). Free 0–100 profitability score on any Bedford address from EV Data Map by Charge Rigs.

Bedford, Massachusetts is served by 23 public electric vehicle charging locations operating 54 individual chargers — an average of 2.3 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 23 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Bedford is ChargePoint Network with 19 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Bedford and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Bedford

In Bedford, Massachusetts, the public charging landscape is heavily influenced by ChargePoint Network, which operates 83% of the city’s 23 Level 2 charging locations. This significant reliance on a single provider can impact user experience regarding uptime and pricing, making it crucial for potential site developers to consider the competitive dynamics. Notably, the absence of DC fast chargers presents a substantial opportunity, as Bedford currently lacks any quick charging solutions. As a result, EV drivers seeking rapid top-ups are likely leaving the city, indicating a clear market gap that new operators could capitalize on to enhance the local charging infrastructure and meet growing demand.

Bedford charging by the numbers

Locations
23
Chargers
54
DC Fast locations
0
Level 2 locations
23

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.3. Average DC fast power: 0 kW.

Bedford charging — local snapshot

Top operator share
ChargePoint Network runs 83% of public locations across 4 networks.
Mix
0% DC fast / 100% Level 2 across 23 locations

Charging networks in Bedford

The following operators run public charging in Bedford, ranked by number of locations.

Featured charging locations in Bedford

A selection of higher-power public charging locations across Bedford, sorted by power level.

  1. Bedford Campus — Bedford, MA, 1730 (Blink Network · Level 2 · 16.6 kW)
  2. 135 South Rd - Tesla Destination — Bedford, MA, 01730 (Tesla Destination · Level 2 · 7.2 kW)
  3. Bedford Police Station — Bedford, MA, 01730 (Non-Networked · Level 2 · 7.2 kW)
  4. Police Station — Bedford, MA, 1730 (Blink Network · Level 2 · 6.6 kW)
  5. BEDFORD-EVS DAVIS SCH 2019 — Bedford, MA, 01730 (ChargePoint Network · Level 2 · 6.5 kW)
  6. CROSBY CROSBYCENTER342 — Bedford, MA, 01730 (ChargePoint Network · Level 2 · 6.5 kW)
  7. CROSBY CROSBYCENTER282 — Bedford, MA, 01730 (ChargePoint Network · Level 2 · 6.5 kW)
  8. BEDFORD-EVS BHS 2021 — Bedford, MA, 01730 (ChargePoint Network · Level 2 · 6.5 kW)
  9. BEDFORD-EVS BHS 2019 — Bedford, MA, 01730 (ChargePoint Network · Level 2 · 6.5 kW)
  10. BEDFORD-EVS JGMS 2019 — Bedford, MA, 01730 (ChargePoint Network · Level 2 · 6.5 kW)
  11. BEDFORD-EVS JGMS 2021 — Bedford, MA, 01730 (ChargePoint Network · Level 2 · 6.5 kW)
  12. SIGNATUREFLIGHT SIGNATURE BED — Bedford, MA, 01730 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Bedford specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 23 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Bedford, Massachusetts?
There are 23 public electric vehicle charging locations in Bedford, Massachusetts, with a combined 54 individual chargers. 0 locations offer DC fast charging and 23 provide Level 2 charging.
What is the largest EV charging network in Bedford?
ChargePoint Network operates the most public charging locations in Bedford with 19 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Bedford?
Level 2 EV chargers in Bedford typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Bedford?
Most Bedford projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Bedford?
A typical commercial Level 2 installation in Bedford energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Bedford take to become profitable?
Payback in Bedford depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.