Install EV Chargers in Brockton, Massachusetts

Install EV chargers or analyze a site in Brockton, Massachusetts. 11 existing public charging locations (1 DC fast, 10 Level 2). Free 0–100 profitability score on any Brockton address from EV Data Map by Charge Rigs.

Brockton, Massachusetts is served by 11 public electric vehicle charging locations operating 23 individual chargers — an average of 2.1 chargers per site. Of those locations, 1 (9%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (91%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Brockton is ChargePoint Network with 8 locations, followed by Blink Network with 1. Average DC fast power across the city is approximately 120 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Brockton and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Brockton

Brockton, Massachusetts boasts a charging landscape largely dominated by the ChargePoint Network, which controls 73% of its 11 public locations, creating a pivotal reliance on a singular operator for uptime and pricing. The city's public charging infrastructure includes only one DC fast charger, averaging 120 kW, placing it below the current standard for faster charging options. With 9% of locations dedicated to DC fast charging, the remaining infrastructure caters primarily to Level 2 demand, making it essential for new operators to consider higher-powered charging solutions of 150 kW or more to attract EV drivers. Analyzing Brockton's EV landscape alongside nearby cities reveals opportunities to address the demand for faster charging options in this competitive market.

Brockton charging by the numbers

Locations
11
Chargers
23
DC Fast locations
1
Level 2 locations
10

DC fast share: 9% of locations. Level 2 share: 91%. Average chargers per site: 2.1. Average DC fast power: 120 kW.

Brockton charging — local snapshot

Top operator share
ChargePoint Network runs 73% of public locations across 4 networks.
Average DC fast power
120 kW (fastest stall: 120 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
9% DC fast / 91% Level 2 across 11 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Brockton

The following operators run public charging in Brockton, ranked by number of locations.

Featured charging locations in Brockton

A selection of higher-power public charging locations across Brockton, sorted by power level.

  1. Copeland Chevrolet — Brockton, MA, 02301 (Non-Networked · DC Fast · 120 kW)
  2. Walgreens #2977 — Brockton, MA, 2301 (Blink Network · Level 2 · 13 kW)
  3. David Gooding Inc - Brockton — Brockton, MA, 02302 (AMPUP · Level 2 · 7.2 kW)
  4. NORTHEAST ELECT STATION 1 — Brockton, MA, 02301 (ChargePoint Network · Level 2 · 6.5 kW)
  5. BAT BAT ADMIN — Brockton, MA, 02302 (ChargePoint Network · Level 2 · 6.5 kW)
  6. NORTHEAST ELECT STATION 2 — Brockton, MA, 02301 (ChargePoint Network · Level 2 · 6.5 kW)
  7. EMPRESA STATION 1 — Brockton, MA, 02301 (ChargePoint Network · Level 2 · 6.5 kW)
  8. TRUBROCKTON MAIN PARKING — Brockton, MA, 02301 (ChargePoint Network · Level 2 · 6.5 kW)
  9. SHBH LIBERTY #3 — Brockton, MA, 02301 (ChargePoint Network · Level 2 · 6.5 kW)
  10. EMPRESA STATION 2 — Brockton, MA, 02301 (ChargePoint Network · Level 2 · 6.5 kW)
  11. BAT BAT GARAGE — Brockton, MA, 02302 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Brockton specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Brockton, Massachusetts?
There are 11 public electric vehicle charging locations in Brockton, Massachusetts, with a combined 23 individual chargers. 1 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Brockton?
ChargePoint Network operates the most public charging locations in Brockton with 8 sites, followed by Blink Network with 1 sites.
How much does it cost to install an EV charger in Brockton?
Level 2 EV chargers in Brockton typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Brockton?
Most Brockton projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Brockton?
A typical commercial Level 2 installation in Brockton energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Brockton take to become profitable?
Payback in Brockton depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.