Install EV Chargers in Framingham, Massachusetts

Install EV chargers or analyze a site in Framingham, Massachusetts. 59 existing public charging locations (17 DC fast, 42 Level 2). Free 0–100 profitability score on any Framingham address from EV Data Map by Charge Rigs.

Framingham, Massachusetts is served by 59 public electric vehicle charging locations operating 184 individual chargers — an average of 3.1 chargers per site. Of those locations, 17 (29%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 42 (71%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Framingham is ChargePoint Network with 43 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 141 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Framingham and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Framingham

Framingham's electric vehicle charging landscape is notably anchored by ChargePoint Network, which comprises a significant 73% of its 59 public charging locations, offering a crucial insight into network reliability and pricing dynamics. The city's 17 DC fast charging stations average a power output of 139 kW, with a standout stall reaching 320 kW, indicating a mid-range charging capability that can accommodate a variety of EVs. Remarkably, 35% of these fast chargers are classified at 150 kW or higher, positioning new entrants still further along the power spectrum to attract drivers looking for quicker top-ups. As 29% of Framingham's total stations are DC fast chargers, operators should focus on leveraging this data to identify gaps and enhance their competitive edge in the local market.

Framingham charging by the numbers

Locations
59
Chargers
184
DC Fast locations
17
Level 2 locations
42

DC fast share: 29% of locations. Level 2 share: 71%. Average chargers per site: 3.1. Average DC fast power: 141 kW.

Framingham charging — local snapshot

Top operator share
ChargePoint Network runs 73% of public locations across 11 networks.
Average DC fast power
141 kW (fastest stall: 320 kW)
High-power share
35% of DC fast sites are 150 kW-class or higher
Mix
29% DC fast / 71% Level 2 across 59 locations
Estimated DC ports
61 fast-charging ports city-wide

Charging networks in Framingham

The following operators run public charging in Framingham, ranked by number of locations.

Featured charging locations in Framingham

A selection of higher-power public charging locations across Framingham, sorted by power level.

  1. NOURIA FRAMINGHAM 1 — Framingham, MA, 01701 (ChargePoint Network · DC Fast · 320 kW)
  2. NOURIA FRAMINGHAM 2 — Framingham, MA, 01701 (ChargePoint Network · DC Fast · 320 kW)
  3. Old Path Village - Tesla Supercharger — Framingham, MA, 01701 (Tesla · DC Fast · 250 kW)
  4. Aloft Hotel - Tesla Supercharger — Framingham, MA, 01702 (Tesla · DC Fast · 250 kW)
  5. 601 Old Connecticut Path — Framingham, MA, 01701 (SHELL_RECHARGE · DC Fast · 180 kW)
  6. Shopper's World - Tesla Supercharger — Framingham, MA, 01701 (Tesla · DC Fast · 150 kW)
  7. MWGROUP1 MWACURAFAST — Framingham, MA, 01702 (ChargePoint Network · DC Fast · 125 kW)
  8. Autel - Framingham Rest Stop Westbound — Framingham, MA, 01701 (AUTEL · DC Fast · 120 kW)
  9. Bazaar Properties LLC — Framingham, MA, 01701 (RED_E · DC Fast · 120 kW)
  10. GMG DCFC 280 02 — Framingham, MA, 01701 (ChargePoint Network · DC Fast · 80 kW)
  11. GMG DCFC 280 01 — Framingham, MA, 01701 (ChargePoint Network · DC Fast · 80 kW)
  12. GMG DCFC 280 03 — Framingham, MA, 01701 (ChargePoint Network · DC Fast · 80 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Framingham specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 17 DC fast and 42 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Framingham, Massachusetts?
There are 59 public electric vehicle charging locations in Framingham, Massachusetts, with a combined 184 individual chargers. 17 locations offer DC fast charging and 42 provide Level 2 charging.
What is the largest EV charging network in Framingham?
ChargePoint Network operates the most public charging locations in Framingham with 43 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Framingham?
Level 2 EV chargers in Framingham typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Framingham?
Most Framingham projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Framingham?
A typical commercial Level 2 installation in Framingham energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Framingham take to become profitable?
Payback in Framingham depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.