Install EV Chargers in Hopkinton, Massachusetts

Install EV chargers or analyze a site in Hopkinton, Massachusetts. 13 existing public charging locations (4 DC fast, 9 Level 2). Free 0–100 profitability score on any Hopkinton address from EV Data Map by Charge Rigs.

Hopkinton, Massachusetts is served by 13 public electric vehicle charging locations operating 21 individual chargers — an average of 1.6 chargers per site. Of those locations, 4 (31%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (69%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Hopkinton is ChargePoint Network with 13 locations. Average DC fast power across the city is approximately 94 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Hopkinton and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Hopkinton

In Hopkinton, Massachusetts, the charging landscape is uniquely shaped by the exclusive presence of the ChargePoint Network, which operates all 13 public charging sites in the area. This consolidation can influence maintenance and pricing strategies, making it vital for new developers to assess the competitive landscape. With 31% of the charging locations offering DC fast charging, the average power output of 94 kW suggests an older technology that may not meet the growing demands of today’s EV drivers. The fastest available charging stall at 125 kW still lags behind newer 150 kW-class offerings prevalent elsewhere, highlighting an opportunity for developers to introduce higher-capacity solutions. This data-driven insight underscores the potential for enhancement within the Hopkinton market.

Hopkinton charging by the numbers

Locations
13
Chargers
21
DC Fast locations
4
Level 2 locations
9

DC fast share: 31% of locations. Level 2 share: 69%. Average chargers per site: 1.6. Average DC fast power: 94 kW.

Hopkinton charging — local snapshot

Top operator share
ChargePoint Network runs 100% of public locations.
Average DC fast power
94 kW (fastest stall: 125 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
31% DC fast / 69% Level 2 across 13 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Hopkinton

The following operators run public charging in Hopkinton, ranked by number of locations.

Featured charging locations in Hopkinton

A selection of higher-power public charging locations across Hopkinton, sorted by power level.

  1. GMG DCFC AF 2766 #2 — Hopkinton, MA, 01748 (ChargePoint Network · DC Fast · 125 kW)
  2. GMG DCFC AF 2766 #1 — Hopkinton, MA, 01748 (ChargePoint Network · DC Fast · 125 kW)
  3. GMG DCFC AF 2766 #4 — Hopkinton, MA, 01748 (ChargePoint Network · DC Fast · 62.5 kW)
  4. GMG DCFC AF 2766 #3 — Hopkinton, MA, 01748 (ChargePoint Network · DC Fast · 62.5 kW)
  5. GREENSTAR GREENSTAR 1 — Hopkinton, MA, 01748 (ChargePoint Network · Level 2 · 6.5 kW)
  6. GREENSTAR GREENSTAR 2 — Hopkinton, MA, 01748 (ChargePoint Network · Level 2 · 6.5 kW)
  7. CONTI 37 A — Hopkinton, MA, 01748 (ChargePoint Network · Level 2 · 6.5 kW)
  8. GREENSTAR GREENSTAR 3 — Hopkinton, MA, 01748 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CONTI CRAIN BLDG — Hopkinton, MA, 01748 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CONTI COIA 1 — Hopkinton, MA, 01748 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CONTI COIA 2 — Hopkinton, MA, 01748 (ChargePoint Network · Level 2 · 6.5 kW)
  12. CONTI HQ — Hopkinton, MA, 01748 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Hopkinton specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Hopkinton, Massachusetts?
There are 13 public electric vehicle charging locations in Hopkinton, Massachusetts, with a combined 21 individual chargers. 4 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Hopkinton?
ChargePoint Network operates the most public charging locations in Hopkinton with 13 sites.
How much does it cost to install an EV charger in Hopkinton?
Level 2 EV chargers in Hopkinton typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Hopkinton?
Most Hopkinton projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Hopkinton?
A typical commercial Level 2 installation in Hopkinton energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Hopkinton take to become profitable?
Payback in Hopkinton depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage