Install EV Chargers in Wellesley, Massachusetts

Install EV chargers or analyze a site in Wellesley, Massachusetts. 25 existing public charging locations (1 DC fast, 24 Level 2). Free 0–100 profitability score on any Wellesley address from EV Data Map by Charge Rigs.

Wellesley, Massachusetts is served by 25 public electric vehicle charging locations operating 50 individual chargers — an average of 2.0 chargers per site. Of those locations, 1 (4%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 24 (96%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Wellesley is ChargePoint Network with 24 locations, followed by FLO with 1. Average DC fast power across the city is approximately 100 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Wellesley and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Wellesley

In Wellesley, Massachusetts, public EV charging is largely driven by ChargePoint Network, which controls 96% of the city's 25 public locations, indicating a robust, centralized infrastructure but also a potential challenge for competition. The lone DC fast charging station offers an average power output of 100 kW, which, while suitable for many drivers, falls short of the higher demand for faster charging options available in nearby markets. With 24 Level 2 chargers catering to longer dwell times, the landscape suggests an opportunity for strategic investments in faster DC fast chargers, particularly those in the 150–350 kW range, to meet evolving driver expectations and elevate the local charging ecosystem.

Wellesley charging by the numbers

Locations
25
Chargers
50
DC Fast locations
1
Level 2 locations
24

DC fast share: 4% of locations. Level 2 share: 96%. Average chargers per site: 2.0. Average DC fast power: 100 kW.

Wellesley charging — local snapshot

Top operator share
ChargePoint Network runs 96% of public locations across 2 networks.
Average DC fast power
100 kW (fastest stall: 100 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
4% DC fast / 96% Level 2 across 25 locations
Estimated DC ports
2 fast-charging ports city-wide

Charging networks in Wellesley

The following operators run public charging in Wellesley, ranked by number of locations.

Featured charging locations in Wellesley

A selection of higher-power public charging locations across Wellesley, sorted by power level.

  1. 4 Municipal Way — Wellesley, MA, 02481 (FLO · DC Fast · 100 kW)
  2. TOWNOFWELLESLEY WABAN LOT 2 — Wellesley, MA, 02482 (ChargePoint Network · Level 2 · 15.4 kW)
  3. TOWNOFWELLESLEY WABAN LOT 1 — Wellesley, MA, 02482 (ChargePoint Network · Level 2 · 15.4 kW)
  4. TOWNOFWELLESLEY HARDY 1 — Wellesley, MA, 02482 (ChargePoint Network · Level 2 · 6.5 kW)
  5. WELLESLEY 60 WALNUT ST #2 — Wellesley, MA, 02481 (ChargePoint Network · Level 2 · 6.5 kW)
  6. BABSON COLLEGE TRIMLOT4 — Wellesley, MA, 02481 (ChargePoint Network · Level 2 · 6.5 kW)
  7. TOWNOFWELLESLEY HARDY 2 — Wellesley, MA, 02482 (ChargePoint Network · Level 2 · 6.5 kW)
  8. MASSBAY STUDENTPARKING3 — Wellesley, MA, 02481 (ChargePoint Network · Level 2 · 6.5 kW)
  9. BABSON COLLEGE COLEMAN 3 — Wellesley, MA, 02457 (ChargePoint Network · Level 2 · 6.5 kW)
  10. BABSON COLLEGE COLEMAN 4 — Wellesley, MA, 02457 (ChargePoint Network · Level 2 · 6.5 kW)
  11. MASSBAY STUDENTPARKING4 — Wellesley, MA, 02481 (ChargePoint Network · Level 2 · 6.5 kW)
  12. TOWNOFWELLESLEY CALVIN LOT — Wellesley, MA, 02482 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Wellesley specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 24 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Wellesley, Massachusetts?
There are 25 public electric vehicle charging locations in Wellesley, Massachusetts, with a combined 50 individual chargers. 1 locations offer DC fast charging and 24 provide Level 2 charging.
What is the largest EV charging network in Wellesley?
ChargePoint Network operates the most public charging locations in Wellesley with 24 sites, followed by FLO with 1 sites.
How much does it cost to install an EV charger in Wellesley?
Level 2 EV chargers in Wellesley typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Wellesley?
Most Wellesley projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Wellesley?
A typical commercial Level 2 installation in Wellesley energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Wellesley take to become profitable?
Payback in Wellesley depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage