Install EV Chargers in Holyoke, Massachusetts

Install EV chargers or analyze a site in Holyoke, Massachusetts. 25 existing public charging locations (9 DC fast, 16 Level 2). Free 0–100 profitability score on any Holyoke address from EV Data Map by Charge Rigs.

Holyoke, Massachusetts is served by 25 public electric vehicle charging locations operating 77 individual chargers — an average of 3.1 chargers per site. Of those locations, 9 (36%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 16 (64%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Holyoke is ChargePoint Network with 14 locations, followed by FLO with 7. Average DC fast power across the city is approximately 285 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Holyoke and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Holyoke

Holyoke, Massachusetts, stands out with its robust and diverse EV charging infrastructure, featuring 25 public locations managed by six distinct operators, predominantly led by ChargePoint Network. The city boasts an impressive 36% of its charging spots as DC fast chargers, which average a powerful 285 kW, with the fastest stall pushing 400 kW. All DC fast stations are classified at 150 kW or higher, catering to the growing demand for ultra-fast charging. This competitive environment not only keeps pricing favorable but also encourages drivers to choose based on power specifications and amenities rather than brand loyalty. The balanced combination of fast and Level 2 chargers caters effectively to various charging needs, making Holyoke an attractive spot for EV drivers.

Holyoke charging by the numbers

Locations
25
Chargers
77
DC Fast locations
9
Level 2 locations
16

DC fast share: 36% of locations. Level 2 share: 64%. Average chargers per site: 3.1. Average DC fast power: 285 kW.

Holyoke charging — local snapshot

Top operator share
ChargePoint Network runs 56% of public locations across 6 networks.
Average DC fast power
285 kW (fastest stall: 400 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
36% DC fast / 64% Level 2 across 25 locations
Estimated DC ports
41 fast-charging ports city-wide

Charging networks in Holyoke

The following operators run public charging in Holyoke, ranked by number of locations.

Featured charging locations in Holyoke

A selection of higher-power public charging locations across Holyoke, sorted by power level.

  1. Holyoke MB.HPC — Holyoke, MA, 01040 (MERCEDES_BENZ · DC Fast · 400 kW)
  2. Starbucks - Tesla Supercharger — Holyoke, MA, 01040 (Tesla · DC Fast · 325 kW)
  3. GPM INVESTMENTS 626 DC1 — Holyoke, MA, 01040 (ChargePoint Network · DC Fast · 320 kW)
  4. GPM INVESTMENTS 626 DC2 — Holyoke, MA, 01040 (ChargePoint Network · DC Fast · 320 kW)
  5. Holyoke, MA — Holyoke, MA, 01040 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
  6. GARY ROME LVL 3 STATION 2 — Holyoke, MA, 01040 (ChargePoint Network · DC Fast · 250 kW)
  7. GARY ROME LVL 3 STATION 1 — Holyoke, MA, 01040 (ChargePoint Network · DC Fast · 250 kW)
  8. MARCOTTE FORD L3-1 — Holyoke, MA, 01040 (ChargePoint Network · DC Fast · 200 kW)
  9. MARCOTTE FORD L3-2 — Holyoke, MA, 01040 (ChargePoint Network · DC Fast · 200 kW)
  10. MARCOTTE FORD AMPED UP — Holyoke, MA, 01040 (ChargePoint Network · Level 2 · 19.2 kW)
  11. MARCOTTE FORD POWER PLAY — Holyoke, MA, 01040 (ChargePoint Network · Level 2 · 19.2 kW)
  12. Holyoke YMCA, Pine Street, Holyoke, MA — Holyoke, MA, 01040 (FLO · Level 2 · 19.2 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Holyoke specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 9 DC fast and 16 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Holyoke, Massachusetts?
There are 25 public electric vehicle charging locations in Holyoke, Massachusetts, with a combined 77 individual chargers. 9 locations offer DC fast charging and 16 provide Level 2 charging.
What is the largest EV charging network in Holyoke?
ChargePoint Network operates the most public charging locations in Holyoke with 14 sites, followed by FLO with 7 sites.
How much does it cost to install an EV charger in Holyoke?
Level 2 EV chargers in Holyoke typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Holyoke?
Most Holyoke projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Holyoke?
A typical commercial Level 2 installation in Holyoke energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Holyoke take to become profitable?
Payback in Holyoke depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage