Install EV chargers or analyze a site in Ludlow, Massachusetts. 11 existing public charging locations (4 DC fast, 7 Level 2). Free 0–100 profitability score on any Ludlow address from EV Data Map by Charge Rigs.
Ludlow, Massachusetts is served by 11 public electric vehicle charging locations operating 18 individual chargers — an average of 1.6 chargers per site. Of those locations, 4 (36%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (64%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Ludlow is ChargePoint Network with 9 locations, followed by AMPUP with 2. Average DC fast power across the city is approximately 125 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Ludlow and receive an instant ROI score, demand projection, and recommended charger configuration.
In Ludlow, Massachusetts, public charging infrastructure is primarily anchored by ChargePoint Network, which operates 82% of the city's 11 charging locations. This heavy reliance on a single network underscores a unique opportunity for site developers considering entry into the market, as they can capitalize on potential gaps left by the mid-range capabilities of existing DC fast chargers, averaging 125 kW. With 36% of the charging locations offering fast charging, the remaining spots cater to Level 2 needs, highlighting a clear distinction in driver preferences that new competitors could strategically address. Additionally, the absence of any 150 kW-class stations emphasizes a market that could benefit from higher power solutions, which may influence driver behavior in navigation applications.
DC fast share: 36% of locations. Level 2 share: 64%. Average chargers per site: 1.6. Average DC fast power: 125 kW.
The following operators run public charging in Ludlow, ranked by number of locations.
A selection of higher-power public charging locations across Ludlow, sorted by power level.
Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Ludlow specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.