Install EV Chargers in Medway, Massachusetts

Install EV chargers or analyze a site in Medway, Massachusetts. 10 existing public charging locations (0 DC fast, 10 Level 2). Free 0–100 profitability score on any Medway address from EV Data Map by Charge Rigs.

Medway, Massachusetts is served by 10 public electric vehicle charging locations operating 26 individual chargers — an average of 2.6 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Medway is ChargePoint Network with 9 locations, followed by EVGATEWAY with 1. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Medway and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Medway

In Medway, Massachusetts, the public EV charging landscape is entirely Level 2, with 10 locations managed predominantly by ChargePoint Network. This heavy reliance on a single operator for 90% of the sites offers a unique advantage in terms of stability and reliability, but also limits options for drivers seeking fast charging solutions, as there are no DC fast chargers available. Consequently, local EV drivers in need of a quick charge must leave the city, highlighting a significant gap in the market. Site developers looking to establish a presence in Medway should consider this lack of rapid charging infrastructure as a prime opportunity to meet the unmet needs of the growing EV community and take advantage of the existing Level 2 network.

Medway charging by the numbers

Locations
10
Chargers
26
DC Fast locations
0
Level 2 locations
10

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.6. Average DC fast power: 0 kW.

Medway charging — local snapshot

Top operator share
ChargePoint Network runs 90% of public locations across 2 networks.
Mix
0% DC fast / 100% Level 2 across 10 locations

Charging networks in Medway

The following operators run public charging in Medway, ranked by number of locations.

Featured charging locations in Medway

A selection of higher-power public charging locations across Medway, sorted by power level.

  1. Hathon Luxury Apartments — Medway, MA, 02053 (EVGATEWAY · Level 2 · 9.6 kW)
  2. 68A MAIN MEDWAY REAR STAT 2 — Medway, MA, 02053 (ChargePoint Network · Level 2 · 6.5 kW)
  3. TOWN OF MEDWAY LIBRARY STAT 1 — Medway, MA, 02053 (ChargePoint Network · Level 2 · 6.5 kW)
  4. TOWN OF MEDWAY POLICE STATION1 — Medway, MA, 02053 (ChargePoint Network · Level 2 · 6.5 kW)
  5. TOWN OF MEDWAY CITY HALL ST1 — Medway, MA, 02053 (ChargePoint Network · Level 2 · 6.5 kW)
  6. 68A MAIN MEDWAY FRONT STAT 1 — Medway, MA, 02053 (ChargePoint Network · Level 2 · 6.5 kW)
  7. TOWN OF MEDWAY OAKLAND PARK — Medway, MA, 02053 (ChargePoint Network · Level 2 · 6.5 kW)
  8. 68A MAIN MEDWAY REAR STAT 1 — Medway, MA, 02053 (ChargePoint Network · Level 2 · 6.5 kW)
  9. TOWN OF MEDWAY CHOATE PARK — Medway, MA, 02053 (ChargePoint Network · Level 2 · 6.5 kW)
  10. TOWN OF MEDWAY CITY HALL ST#2 — Medway, MA, 02053 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Medway specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Medway, Massachusetts?
There are 10 public electric vehicle charging locations in Medway, Massachusetts, with a combined 26 individual chargers. 0 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Medway?
ChargePoint Network operates the most public charging locations in Medway with 9 sites, followed by EVGATEWAY with 1 sites.
How much does it cost to install an EV charger in Medway?
Level 2 EV chargers in Medway typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Medway?
Most Medway projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Medway?
A typical commercial Level 2 installation in Medway energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Medway take to become profitable?
Payback in Medway depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.