Install EV chargers or analyze a site in Waltham, Massachusetts. 59 existing public charging locations (3 DC fast, 56 Level 2). Free 0–100 profitability score on any Waltham address from EV Data Map by Charge Rigs.

Waltham, Massachusetts is served by 59 public electric vehicle charging locations operating 120 individual chargers — an average of 2.0 chargers per site. Of those locations, 3 (5%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 56 (95%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Waltham is ChargePoint Network with 54 locations, followed by CHARGELAB with 2. Average DC fast power across the city is approximately 143 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Waltham and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Waltham

Waltham's EV charging infrastructure features a high concentration of ChargePoint Network, which operates 92% of the city's 59 public charging locations, creating a reliable but relatively homogeneous network landscape. While only 5% of these locations are DC fast chargers, they provide an average output of 143 kW, with 33% being 150 kW-class or higher, making them competitive in the region. New sites offering 150-350 kW capabilities could attract drivers away from the existing infrastructure by enhancing the charging experience. Additionally, the predominance of Level 2 chargers caters to longer-dwell demand, indicating a balanced but varied charging approach in Waltham. EV Data Map can help identify strategic opportunities in this market for expanding the charging network.

Waltham charging by the numbers

Locations
59
Chargers
120
DC Fast locations
3
Level 2 locations
56

DC fast share: 5% of locations. Level 2 share: 95%. Average chargers per site: 2.0. Average DC fast power: 143 kW.

Waltham charging — local snapshot

Top operator share
ChargePoint Network runs 92% of public locations across 5 networks.
Average DC fast power
143 kW (fastest stall: 180 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
5% DC fast / 95% Level 2 across 59 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Waltham

The following operators run public charging in Waltham, ranked by number of locations.

Featured charging locations in Waltham

A selection of higher-power public charging locations across Waltham, sorted by power level.

  1. 26 Seyon Street — Waltham, MA, 02453 (EV Connect · DC Fast · 180 kW)
  2. HION NETWORK WALTHAM BK#2 — Waltham, MA, 02453 (ChargePoint Network · DC Fast · 125 kW)
  3. HION NETWORK WALTHAM BK#1 — Waltham, MA, 02453 (ChargePoint Network · DC Fast · 125 kW)
  4. 100 5th Ave — Waltham, MA, 02451 (CHARGELAB · Level 2 · 7.2 kW)
  5. 275 2nd Ave — Waltham, MA, 02451 (CHARGELAB · Level 2 · 7.2 kW)
  6. Hyatt House — Waltham, MA, 02451 (EVGATEWAY · Level 2 · 7.2 kW)
  7. MGH Waltham - Patient Garage #1 — Waltham, MA, 02451 (Non-Networked · Level 2 · 7.2 kW)
  8. 500 TOTTEN POND CP010-03 — Waltham, MA, 02451 (ChargePoint Network · Level 2 · 6.5 kW)
  9. MA PORTFOLIO 275 WYMAN ST #2 — Waltham, MA, 02451 (ChargePoint Network · Level 2 · 6.5 kW)
  10. MA PORTFOLIO HOBBS STATION 5 — Waltham, MA, 02451 (ChargePoint Network · Level 2 · 6.5 kW)
  11. RESERVOR WOODS STATION 1 — Waltham, MA, 02451 (ChargePoint Network · Level 2 · 6.5 kW)
  12. BOSCH WALTHAM STATION 1 — Waltham, MA, 02451 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Waltham specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 56 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Waltham, Massachusetts?
There are 59 public electric vehicle charging locations in Waltham, Massachusetts, with a combined 120 individual chargers. 3 locations offer DC fast charging and 56 provide Level 2 charging.
What is the largest EV charging network in Waltham?
ChargePoint Network operates the most public charging locations in Waltham with 54 sites, followed by CHARGELAB with 2 sites.
How much does it cost to install an EV charger in Waltham?
Level 2 EV chargers in Waltham typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Waltham?
Most Waltham projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Waltham?
A typical commercial Level 2 installation in Waltham energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Waltham take to become profitable?
Payback in Waltham depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage