Install EV Chargers in Auburn Hills, Michigan

Install EV chargers or analyze a site in Auburn Hills, Michigan. 18 existing public charging locations (4 DC fast, 14 Level 2). Free 0–100 profitability score on any Auburn Hills address from EV Data Map by Charge Rigs.

Auburn Hills, Michigan is served by 18 public electric vehicle charging locations operating 73 individual chargers — an average of 4.1 chargers per site. Of those locations, 4 (22%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (78%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Auburn Hills is ChargePoint Network with 7 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 225 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Auburn Hills and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Auburn Hills

Auburn Hills stands out with a diverse public charging landscape featuring 18 locations from 10 distinct operators, including chargeTime Network, which accounts for nearly 40% of available sites. The city's emphasis on fast charging is notable, as 22% of the public stations are DC fast chargers, with an impressive average power of 225 kW—significantly bolstered by a peak stall power of 350 kW. This ultra-fast infrastructure positions Auburn Hills competitively, making it essential for site developers to consider the local preferences for charging power and amenities, as 75% of the DC fast stations offer 150 kW-class or higher. The mix of DC fast and Level 2 charging options caters to a variety of user needs, revealing opportunities for strategic further development in line with EV demand trends.

Auburn Hills charging by the numbers

Locations
18
Chargers
73
DC Fast locations
4
Level 2 locations
14

DC fast share: 22% of locations. Level 2 share: 78%. Average chargers per site: 4.1. Average DC fast power: 225 kW.

Auburn Hills charging — local snapshot

Top operator share
ChargePoint Network runs 39% of public locations across 10 networks.
Average DC fast power
225 kW (fastest stall: 350 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
22% DC fast / 78% Level 2 across 18 locations
Estimated DC ports
20 fast-charging ports city-wide

Charging networks in Auburn Hills

The following operators run public charging in Auburn Hills, ranked by number of locations.

Featured charging locations in Auburn Hills

A selection of higher-power public charging locations across Auburn Hills, sorted by power level.

  1. Simon Property Group Great Lakes Crossing (Auburn Hills, MI) — Auburn Hills, MI, 48326 (Electrify America · DC Fast · 350 kW)
  2. Great Lakes Shopping Center — Auburn Hills, MI, 48326 (eVgo Network · DC Fast · 350 kW)
  3. Meijer - Tesla Supercharger — Auburn Hills, MI, 48326 (Tesla · DC Fast · 150 kW)
  4. The Auburn Mile Shopping Center - Meijer — Auburn Hills, MI, 48326 (JULE · DC Fast · 50 kW)
  5. Martinrea International US Inc — Auburn Hills, MI, 48326 (Blink Network · Level 2 · 16.6 kW)
  6. Staybridge Suites Auburn Hills — Auburn Hills, MI, 48326 (RED_E · Level 2 · 12 kW)
  7. Holiday Inn Auburn Hills — Auburn Hills, MI, 48326 (RED_E · Level 2 · 12 kW)
  8. Umicore Autocat - Annex — Auburn Hills, MI, 48326 (Non-Networked · Level 2 · 11.5 kW)
  9. Fountain Circle Apartment Homes — Auburn Hills, MI, 48326 (EV Connect · Level 2 · 7.4 kW)
  10. Oakland University - Human Health Building — Auburn Hills, MI, 48326 (Non-Networked · Level 2 · 7.2 kW)
  11. Michigan Factory – Public (Power sharing) — Auburn Hills, MI, 48326 (FLO · Level 2 · 7.2 kW)
  12. AUBURN HILLS GARAGE EV 02 — Auburn Hills, MI, 48326 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Auburn Hills specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Auburn Hills, Michigan?
There are 18 public electric vehicle charging locations in Auburn Hills, Michigan, with a combined 73 individual chargers. 4 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Auburn Hills?
ChargePoint Network operates the most public charging locations in Auburn Hills with 7 sites, followed by Non-Networked with 2 sites.
How much does it cost to install an EV charger in Auburn Hills?
Level 2 EV chargers in Auburn Hills typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Auburn Hills?
Most Auburn Hills projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Auburn Hills?
A typical commercial Level 2 installation in Auburn Hills energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Auburn Hills take to become profitable?
Payback in Auburn Hills depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.