Install EV chargers or analyze a site in Traverse City, Michigan. 46 existing public charging locations (11 DC fast, 35 Level 2). Free 0–100 profitability score on any Traverse City address from EV Data Map by Charge Rigs.
Traverse City, Michigan is served by 46 public electric vehicle charging locations operating 128 individual chargers — an average of 2.8 chargers per site. Of those locations, 11 (24%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 35 (76%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Traverse City is ChargePoint Network with 25 locations, followed by RED_E with 8. Average DC fast power across the city is approximately 115 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Traverse City and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Traverse City
Traverse City boasts a compelling public charging landscape, with 46 locations powered by eight distinct networks, enhancing competition and enabling drivers to choose based on power and availability rather than brand loyalty. This city features a balanced offering of 24% DC fast charging stations, averaging a notable 115 kW, with the capability to reach up to 300 kW at its fastest stall. The fact that 27% of DC fast sites are 150 kW-class or higher positions Traverse City as an attractive option for those needing rapid charging solutions. By enhancing the variety of operators, local drivers can optimize their charging experiences, complementing the area's growing EV infrastructure.
Traverse City charging by the numbers
Locations
46
Chargers
128
DC Fast locations
11
Level 2 locations
35
DC fast share: 24% of locations. Level 2 share: 76%. Average chargers per site: 2.8. Average DC fast power: 115 kW.
Traverse City charging — local snapshot
Top operator share
ChargePoint Network runs 54% of public locations across 8 networks.
Average DC fast power
115 kW (fastest stall: 300 kW)
High-power share
27% of DC fast sites are 150 kW-class or higher
Mix
24% DC fast / 76% Level 2 across 46 locations
Estimated DC ports
38 fast-charging ports city-wide
Charging networks in Traverse City
The following operators run public charging in Traverse City, ranked by number of locations.
ChargePoint Network — 25 locations
RED_E — 8 locations
Blink Network — 4 locations
Non-Networked — 4 locations
Tesla Destination — 2 locations
RIVIAN_ADVENTURE — 1 location
Tesla — 1 location
AMPUP — 1 location
Featured charging locations in Traverse City
A selection of higher-power public charging locations across Traverse City, sorted by power level.
Traverse City, MI — Traverse City, MI, 49684 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
Burger King Traverse City — Traverse City, MI, 49686 (RED_E · DC Fast · 161 kW)
Meijer - Tesla Supercharger — Traverse City, MI, 49684 (Tesla · DC Fast · 150 kW)
Fox Ford Traverse City - DCFC — Traverse City, MI, 49684 (Blink Network · DC Fast · 120 kW)
Serra Hyundai TC - Showroom — Traverse City, MI, 49686 (Blink Network · DC Fast · 120 kW)
Clinch Park Marina Public Parking — Traverse City, MI, 49684 (RED_E · DC Fast · 120 kW)
Hall St Public Parking — Traverse City, MI, 49684 (RED_E · DC Fast · 120 kW)
BLAINS CHARGER BLAINS LEVEL 3 — Traverse City, MI, 49685 (ChargePoint Network · DC Fast · 62.5 kW)
WINDEMULLER EV2 — Traverse City, MI, 49686 (ChargePoint Network · DC Fast · 62.5 kW)
Williams Chevrolet — Traverse City, MI, 49684 (Non-Networked · DC Fast · 25 kW)
WILLIAMS AUTO G ABB STATION 1 — Traverse City, MI, 49684 (ChargePoint Network · DC Fast · 24 kW)
Fox Ford Traverse City — Traverse City, MI, 49684 (Blink Network · Level 2 · 21.6 kW)
Nearby cities with EV charging coverage
Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Traverse City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 11 DC fast and 35 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Traverse City, Michigan?
There are 46 public electric vehicle charging locations in Traverse City, Michigan, with a combined 128 individual chargers. 11 locations offer DC fast charging and 35 provide Level 2 charging.
What is the largest EV charging network in Traverse City?
ChargePoint Network operates the most public charging locations in Traverse City with 25 sites, followed by RED_E with 8 sites.
How much does it cost to install an EV charger in Traverse City?
Level 2 EV chargers in Traverse City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Traverse City?
Most Traverse City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Traverse City?
A typical commercial Level 2 installation in Traverse City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Traverse City take to become profitable?
Payback in Traverse City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.