Install EV Chargers in Bay City, Michigan

Install EV chargers or analyze a site in Bay City, Michigan. 13 existing public charging locations (4 DC fast, 6 Level 2). Free 0–100 profitability score on any Bay City address from EV Data Map by Charge Rigs.

Bay City, Michigan is served by 13 public electric vehicle charging locations operating 34 individual chargers — an average of 2.6 chargers per site. Of those locations, 4 (31%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (46%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Bay City is Non-Networked with 6 locations, followed by ChargePoint Network with 2. Average DC fast power across the city is approximately 168 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Bay City and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Bay City

Bay City runs a comparatively competitive public charging market: 6 distinct operators share its 13 locations, with Non-Networked the largest at 46% of sites. That diversity tends to keep pricing and uptime competitive but also makes corridor-style site selection more nuanced — drivers in Bay City pick on power and amenity rather than defaulting to a single brand. The 4 DC fast locations average 168 kW, with the fastest site at 350 kW. That is a modern high-power fleet by current US standards; 50% of DC fast sites are 150 kW-class or higher. New entrants pricing around 150–350 kW hardware will sit at the top of the local power curve, which matters for driver selection in nav apps. By mix, 31% of Bay City's public locations are DC fast and the rest serve longer-dwell Level 2 demand, with roughly 18 DC fast ports across the city. EV Data Map scores any Bay City address against this footprint and the surrounding traffic, demographics and grid context to surface the gaps worth filling first.

Bay City charging by the numbers

Locations
13
Chargers
34
DC Fast locations
4
Level 2 locations
6

DC fast share: 31% of locations. Level 2 share: 46%. Average chargers per site: 2.6. Average DC fast power: 168 kW.

Bay City charging — local snapshot

Top operator share
Non-Networked runs 46% of public locations across 6 networks.
Average DC fast power
168 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
31% DC fast / 69% Level 2 across 13 locations
Estimated DC ports
18 fast-charging ports city-wide

Charging networks in Bay City

The following operators run public charging in Bay City, ranked by number of locations.

Featured charging locations in Bay City

A selection of higher-power public charging locations across Bay City, sorted by power level.

  1. Meijer Bay City (Bay City, MI) — Bay City, MI, 48706 (Electrify America · DC Fast · 350 kW)
  2. Meijer - Tesla Supercharger — Bay City, MI, 48706 (Tesla · DC Fast · 150 kW)
  3. Garber Ford Bay City - DCFC — Bay City, MI, 48706 (Blink Network · DC Fast · 120 kW)
  4. Graff Chevrolet Bay City MI — Bay City, MI, 48706 (RED_E · DC Fast · 50 kW)
  5. Garber Ford Bay City - Series — Bay City, MI, 48706 (Blink Network · Level 2 · 16.6 kW)
  6. Showcase Mitsubishi — Bay City, MI, 48706 (Non-Networked · Level 2 · 7.2 kW)
  7. Graff Chevrolet — Bay City, MI, 48706 (Non-Networked · Level 2 · 7.2 kW)
  8. Thelen Audi Volkswagen Mazda — Bay City, MI, 48706 (Non-Networked · Level 2 · 7.2 kW)
  9. MICHIGAN DEPART STATION 1 — Bay City, MI, 48706 (ChargePoint Network · Level 2 · 6.5 kW)
  10. MICHIGAN DEPART STATION 2 — Bay City, MI, 48706 (ChargePoint Network · Level 2 · 6.5 kW)
  11. Bay City - State Recreation Area — Bay City, MI, 48706 (Non-Networked · unknown · 1.4 kW)
  12. Bay City - Water St Parking Lot — Bay City, MI, 48708 (Non-Networked · unknown · 1.4 kW)

Nearby cities with EV charging coverage

Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Bay City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Bay City, Michigan?
There are 13 public electric vehicle charging locations in Bay City, Michigan, with a combined 34 individual chargers. 4 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Bay City?
Non-Networked operates the most public charging locations in Bay City with 6 sites, followed by ChargePoint Network with 2 sites.
How much does it cost to install an EV charger in Bay City?
Level 2 EV chargers in Bay City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Bay City?
Most Bay City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Bay City?
A typical commercial Level 2 installation in Bay City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Bay City take to become profitable?
Payback in Bay City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage