Install EV Chargers in Austin, Minnesota

Install EV chargers or analyze a site in Austin, Minnesota. 15 existing public charging locations (1 DC fast, 14 Level 2). Free 0–100 profitability score on any Austin address from EV Data Map by Charge Rigs.

Austin, Minnesota is served by 15 public electric vehicle charging locations operating 39 individual chargers — an average of 2.6 chargers per site. Of those locations, 1 (7%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (93%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Austin is Blink Network with 6 locations, followed by ZEFNET with 4. Average DC fast power across the city is approximately 96 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Austin and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Austin

Austin, Minnesota boasts a diverse EV charging landscape with 15 public locations managed by five distinct operators, creating competitive pricing and uptime. The prevalence of Blink Network, with 40% of the sites, offers drivers a trusted option among varied choices tailored to individual needs. While the lone DC fast charger operates at a maximum of 96 kW, positioning it toward the lower spectrum of current charging capabilities, it highlights a notable area for future improvement, as higher-powered stations are key to attracting drivers. For those requiring longer dwell times, Level 2 chargers are the mainstay, catering to specific user demands. Austin's structure encourages strategic site selection, making it crucial for developers to consider evolving consumer preferences in this developing market.

Austin charging by the numbers

Locations
15
Chargers
39
DC Fast locations
1
Level 2 locations
14

DC fast share: 7% of locations. Level 2 share: 93%. Average chargers per site: 2.6. Average DC fast power: 96 kW.

Austin charging — local snapshot

Top operator share
Blink Network runs 40% of public locations across 5 networks.
Average DC fast power
96 kW (fastest stall: 96 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
7% DC fast / 93% Level 2 across 15 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Austin

The following operators run public charging in Austin, ranked by number of locations.

Featured charging locations in Austin

A selection of higher-power public charging locations across Austin, sorted by power level.

  1. Austin Ford Jeep — Austin, MN, 55912 (RED_E · DC Fast · 96 kW)
  2. R&D Lab — Austin, MN, 55912 (Blink Network · Level 2 · 12 kW)
  3. Downtown Austin — Austin, MN, 55912 (ZEFNET · Level 2 · 11.8 kW)
  4. AU Riverland charger — Austin, MN, 55912 (ZEFNET · Level 2 · 11.8 kW)
  5. 1st St NW — Austin, MN, 55912 (ZEFNET · Level 2 · 11.7 kW)
  6. Mill on Main — Austin, MN, 55912 (Blink Network · Level 2 · 10.8 kW)
  7. Corporate Office North — Austin, MN, 55912 (Blink Network · Level 2 · 10.4 kW)
  8. Corporate Office South — Austin, MN, 55912 (Blink Network · Level 2 · 10.4 kW)
  9. R&D Innovation Center (Pilot Plant) — Austin, MN, 55912 (Blink Network · Level 2 · 10.4 kW)
  10. SPAM Museum — Austin, MN, 55912 (Blink Network · Level 2 · 10.4 kW)
  11. AU Office Lvl 2 — Austin, MN, 55912 (ZEFNET · Level 2 · 10.1 kW)
  12. Holiday inn Austin Conference Center - Tesla Destination — Austin, MN, 55912 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Minnesota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Austin specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Austin, Minnesota?
There are 15 public electric vehicle charging locations in Austin, Minnesota, with a combined 39 individual chargers. 1 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Austin?
Blink Network operates the most public charging locations in Austin with 6 sites, followed by ZEFNET with 4 sites.
How much does it cost to install an EV charger in Austin?
Level 2 EV chargers in Austin typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Austin?
Most Austin projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Minnesota state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Austin?
A typical commercial Level 2 installation in Austin energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Austin take to become profitable?
Payback in Austin depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage