Install EV chargers or analyze a site in Shakopee, Minnesota. 15 existing public charging locations (1 DC fast, 14 Level 2). Free 0–100 profitability score on any Shakopee address from EV Data Map by Charge Rigs.
Shakopee, Minnesota is served by 15 public electric vehicle charging locations operating 42 individual chargers — an average of 2.8 chargers per site. Of those locations, 1 (7%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (93%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Shakopee is ChargePoint Network with 11 locations, followed by SYNERGEV with 1. Average DC fast power across the city is approximately 180 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Shakopee and receive an instant ROI score, demand projection, and recommended charger configuration.
Shakopee, Minnesota presents a unique landscape for EV charging infrastructure, predominantly shaped by its reliance on the ChargePoint Network, which operates 73% of the city's 15 public charging locations. With only one DC fast charging site, averaging 180 kW, Shakopee's fast charging capacity is particularly robust, setting a high standard since all DC fast stations are 150 kW or higher. This creates a competitive edge for new operators planning to enter the market with higher power options, as local drivers increasingly seek out the fastest charging solutions. The predominance of Level 2 chargers caters to longer dwell times, highlighting a strategic opportunity for site developers to fill gaps in higher-speed charging amid a growing demand for accessibility and reliability.
DC fast share: 7% of locations. Level 2 share: 93%. Average chargers per site: 2.8. Average DC fast power: 180 kW.
The following operators run public charging in Shakopee, ranked by number of locations.
A selection of higher-power public charging locations across Shakopee, sorted by power level.
Other cities in Minnesota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Shakopee specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.