Install EV chargers or analyze a site in Edina, Minnesota. 28 existing public charging locations (1 DC fast, 27 Level 2). Free 0–100 profitability score on any Edina address from EV Data Map by Charge Rigs.
Edina, Minnesota is served by 28 public electric vehicle charging locations operating 71 individual chargers — an average of 2.5 chargers per site. Of those locations, 1 (4%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 27 (96%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Edina is ChargePoint Network with 22 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 350 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Edina and receive an instant ROI score, demand projection, and recommended charger configuration.
Edina, Minnesota presents a unique landscape for EV charging, with ChargePoint Network dominating the scene at 79% of the city’s 28 public locations. This concentration creates a reliance on a single operator for uptime and network reliability, which is a key consideration for any new developer. notable is the city's ultra-fast charging capability; the sole DC fast charging site boasts an impressive average of 350 kW, positioning it among the fastest in the U.S. Moreover, all DC fast locations operate at a minimum of 150 kW, enticing drivers to select Edina for their charging needs. With a well-balanced mix of Level 2 and fast charging ports, potential operators should leverage this data to identify strategic gaps in the market, capitalizing on the demand for expanded high-power options.
DC fast share: 4% of locations. Level 2 share: 96%. Average chargers per site: 2.5. Average DC fast power: 350 kW.
The following operators run public charging in Edina, ranked by number of locations.
A selection of higher-power public charging locations across Edina, sorted by power level.
Other cities in Minnesota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Edina specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 27 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.