Install EV Chargers in Great Falls, Montana

Install EV chargers or analyze a site in Great Falls, Montana. 11 existing public charging locations (2 DC fast, 9 Level 2). Free 0–100 profitability score on any Great Falls address from EV Data Map by Charge Rigs.

Great Falls, Montana is served by 11 public electric vehicle charging locations operating 28 individual chargers — an average of 2.5 chargers per site. Of those locations, 2 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Great Falls is ChargePoint Network with 5 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 137 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Great Falls and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Great Falls

Great Falls offers a well-rounded EV charging landscape with 11 public locations across six distinct networks, enhancing competition and driving better pricing and uptime for users. ChargePoint Network leads the charge with 45% of the sites, but the availability of multiple operators allows drivers to choose charging options based on power and amenities. Notably, 18% of the city's charging sites are DC fast, averaging 137 kW, with half of those locations featuring power outputs at 150 kW or higher. This positions Great Falls as a strong contender for EV drivers who prioritize faster charging when planning their journeys, especially as higher-powered options emerge to further attract users navigating through the region.

Great Falls charging by the numbers

Locations
11
Chargers
28
DC Fast locations
2
Level 2 locations
9

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 2.5. Average DC fast power: 137 kW.

Great Falls charging — local snapshot

Top operator share
ChargePoint Network runs 45% of public locations across 6 networks.
Average DC fast power
137 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 11 locations
Estimated DC ports
10 fast-charging ports city-wide

Charging networks in Great Falls

The following operators run public charging in Great Falls, ranked by number of locations.

Featured charging locations in Great Falls

A selection of higher-power public charging locations across Great Falls, sorted by power level.

  1. Great Falls Hampton Inn - Tesla Supercharger — Great Falls, MT, 59404 (Tesla · DC Fast · 250 kW)
  2. Great Falls Subaru — Great Falls, MT, 59401 (EV Connect · DC Fast · 23 kW)
  3. Great Falls Subaru — Great Falls, MT, 59401 (Blink Network · Level 2 · 21.6 kW)
  4. TOWNEPLACE GF STATION 1 — Great Falls, MT, 59404 (ChargePoint Network · Level 2 · 9.6 kW)
  5. TOWNEPLACE GF STATION 2 — Great Falls, MT, 59404 (ChargePoint Network · Level 2 · 9.6 kW)
  6. Spring Hill Suites - Great Falls, MT - Tesla Destination — Great Falls, MT, 59404 (Tesla Destination · Level 2 · 7.2 kW)
  7. Best Western Plus Riverfront Hotel and Suites — Great Falls, MT, 59405 (TURNONGREEN · Level 2 · 7 kW)
  8. CITY MOTOR CO CITY TOYOTA 1 — Great Falls, MT, 59405 (ChargePoint Network · Level 2 · 6.5 kW)
  9. BWPLUS STATION 1 — Great Falls, MT, 59405 (ChargePoint Network · Level 2 · 6.5 kW)
  10. N40 OUTFITTERS NORTH 40 WGF — Great Falls, MT, 59404 (ChargePoint Network · Level 2 · 6.5 kW)
  11. Citizens Alliance Bank Great Falls — Great Falls, MT, 59405 (Blink Network · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Montana we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Great Falls specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Great Falls, Montana?
There are 11 public electric vehicle charging locations in Great Falls, Montana, with a combined 28 individual chargers. 2 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Great Falls?
ChargePoint Network operates the most public charging locations in Great Falls with 5 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Great Falls?
Level 2 EV chargers in Great Falls typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Great Falls?
Most Great Falls projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Montana state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Great Falls?
A typical commercial Level 2 installation in Great Falls energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Great Falls take to become profitable?
Payback in Great Falls depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage