Install EV Chargers in Missoula, Montana

Install EV chargers or analyze a site in Missoula, Montana. 20 existing public charging locations (7 DC fast, 13 Level 2). Free 0–100 profitability score on any Missoula address from EV Data Map by Charge Rigs.

Missoula, Montana is served by 20 public electric vehicle charging locations operating 56 individual chargers — an average of 2.8 chargers per site. Of those locations, 7 (35%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (65%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Missoula is ChargePoint Network with 9 locations, followed by Tesla Destination with 3. Average DC fast power across the city is approximately 152 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Missoula and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Missoula

Missoula boasts a robust public charging network marked by the presence of eight distinct operators, enhancing competition and offering EV drivers a variety of options. With 35% of its 20 public charging locations equipped with DC fast chargers, the city stands out for its average fast charger output of 152 kW, and a record high of 350 kW at the fastest stall. Notably, 43% of the DC fast sites are rated at 150 kW or higher, positioning Missoula as a destination for those seeking efficient charging solutions. The dominance of ChargePoint Network at 45% of locations further underscores the city's commitment to a responsive charging landscape, ensuring that both power and amenities are accessible to drivers. As users navigate charging options, Missoula's diverse offerings support strategic corridor charging and address varying driver needs effectively.

Missoula charging by the numbers

Locations
20
Chargers
56
DC Fast locations
7
Level 2 locations
13

DC fast share: 35% of locations. Level 2 share: 65%. Average chargers per site: 2.8. Average DC fast power: 152 kW.

Missoula charging — local snapshot

Top operator share
ChargePoint Network runs 45% of public locations across 8 networks.
Average DC fast power
152 kW (fastest stall: 350 kW)
High-power share
43% of DC fast sites are 150 kW-class or higher
Mix
35% DC fast / 65% Level 2 across 20 locations
Estimated DC ports
28 fast-charging ports city-wide

Charging networks in Missoula

The following operators run public charging in Missoula, ranked by number of locations.

Featured charging locations in Missoula

A selection of higher-power public charging locations across Missoula, sorted by power level.

  1. Walmart 3259 (Missoula, MT) — Missoula, MT, 59808 (Electrify America · DC Fast · 350 kW)
  2. Town Pump Travel Center - Tesla Supercharger — Missoula, MT, 59808 (Tesla · DC Fast · 250 kW)
  3. Best Western Plus Grant Creek Inn - Tesla Supercharger — Missoula, MT, 59808 (Tesla · DC Fast · 150 kW)
  4. L267 EXPP PL PUBLIC2 — Missoula, MT, 59804 (ChargePoint Network · DC Fast · 120 kW)
  5. L267 EXPP PL PUBLIC1 — Missoula, MT, 59804 (ChargePoint Network · DC Fast · 120 kW)
  6. Missoula Chevrolet — Missoula, MT, 59808 (EV Connect · DC Fast · 50 kW)
  7. CAMPBELL KIA MTKIA 1 ABB — Missoula, MT, 59808 (ChargePoint Network · DC Fast · 24 kW)
  8. Missoula Downtown EV Charging - Tesla Destination — Missoula, MT, 59802 (Tesla Destination · Level 2 · 11 kW)
  9. Gray Wolf Peak Casino — Missoula, MT, 59808 (Blink Network · Level 2 · 10.4 kW)
  10. Snowfarm Apartments — Missoula, MT, 59808 (LOOP · Level 2 · 7.7 kW)
  11. Park Place Garage — Missoula, MT, 59802 (Non-Networked · Level 2 · 7.2 kW)
  12. Flanagan Motors — Missoula, MT, 59801 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Montana we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Missoula specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Missoula, Montana?
There are 20 public electric vehicle charging locations in Missoula, Montana, with a combined 56 individual chargers. 7 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Missoula?
ChargePoint Network operates the most public charging locations in Missoula with 9 sites, followed by Tesla Destination with 3 sites.
How much does it cost to install an EV charger in Missoula?
Level 2 EV chargers in Missoula typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Missoula?
Most Missoula projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Montana state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Missoula?
A typical commercial Level 2 installation in Missoula energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Missoula take to become profitable?
Payback in Missoula depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.