Install EV Chargers in Carson City, Nevada

Install EV chargers or analyze a site in Carson City, Nevada. 25 existing public charging locations (6 DC fast, 19 Level 2). Free 0–100 profitability score on any Carson City address from EV Data Map by Charge Rigs.

Carson City, Nevada is served by 25 public electric vehicle charging locations operating 70 individual chargers — an average of 2.8 chargers per site. Of those locations, 6 (24%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 19 (76%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Carson City is ChargePoint Network with 15 locations, followed by SWTCH with 3. Average DC fast power across the city is approximately 243 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Carson City and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Carson City

Carson City, Nevada, showcases a concentrated EV charging landscape, with 60% of its 25 public charging locations managed by the ChargePoint Network. This reliance on a single operator ensures consistent reliability, but also presents competitive challenges for new site developers. The city's 6 DC fast chargers deliver an impressive average power of 243 kW, with 83% classified as 150 kW or higher, making them some of the fastest options available. With only 24% of public charging stations offering DC fast options, there exists a clear opportunity to cater to the increasing demand for ultra-fast charging solutions, especially as drivers prioritize charging speed in their navigation choices. Understanding this distinct landscape is crucial for identifying gaps in service and enhancing the local EV infrastructure.

Carson City charging by the numbers

Locations
25
Chargers
70
DC Fast locations
6
Level 2 locations
19

DC fast share: 24% of locations. Level 2 share: 76%. Average chargers per site: 2.8. Average DC fast power: 243 kW.

Carson City charging — local snapshot

Top operator share
ChargePoint Network runs 60% of public locations across 8 networks.
Average DC fast power
243 kW (fastest stall: 400 kW)
High-power share
83% of DC fast sites are 150 kW-class or higher
Mix
24% DC fast / 76% Level 2 across 25 locations
Estimated DC ports
27 fast-charging ports city-wide

Charging networks in Carson City

The following operators run public charging in Carson City, ranked by number of locations.

Featured charging locations in Carson City

A selection of higher-power public charging locations across Carson City, sorted by power level.

  1. 3620 N Carson St — Carson City, NV, 89706 (HYPERFUEL · DC Fast · 400 kW)
  2. The Ranch Course - Tesla Supercharger (Genoa Golf Club) — Carson City, NV, 89705 (Tesla · DC Fast · 325 kW)
  3. L3 STATION NORTH — Carson City, NV, 89701 (ChargePoint Network · DC Fast · 250 kW)
  4. L3 STATION SOUTH — Carson City, NV, 89701 (ChargePoint Network · DC Fast · 250 kW)
  5. Carson City — Carson City, NV, 89706 (EVRANGE · DC Fast · 180 kW)
  6. STUDENT APT FISH STUDENT — Carson City, NV, 89701 (ChargePoint Network · DC Fast · 50 kW)
  7. Spooner Lake — Carson City, NV, 89703 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
  8. 211 S Nevada St Parking Lot — Carson City, NV, 89703 (SWTCH · Level 2 · 7.2 kW)
  9. Legislative Counsel Bureau — Carson City, NV, 89701 (Non-Networked · Level 2 · 7.2 kW)
  10. Michael Hohl Motor Co — Carson City, NV, 89701 (Non-Networked · Level 2 · 7.2 kW)
  11. Hampton Inn & Suites Carson City - Tesla Destination — Carson City, NV, 89706 (Tesla Destination · Level 2 · 7.2 kW)
  12. Swtch Energy — Carson City, NV, 89703 (SWTCH · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Nevada we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Carson City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 19 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Carson City, Nevada?
There are 25 public electric vehicle charging locations in Carson City, Nevada, with a combined 70 individual chargers. 6 locations offer DC fast charging and 19 provide Level 2 charging.
What is the largest EV charging network in Carson City?
ChargePoint Network operates the most public charging locations in Carson City with 15 sites, followed by SWTCH with 3 sites.
How much does it cost to install an EV charger in Carson City?
Level 2 EV chargers in Carson City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Carson City?
Most Carson City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Nevada state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Carson City?
A typical commercial Level 2 installation in Carson City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Carson City take to become profitable?
Payback in Carson City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.