Install EV chargers or analyze a site in Henderson, Nevada. 70 existing public charging locations (13 DC fast, 57 Level 2). Free 0–100 profitability score on any Henderson address from EV Data Map by Charge Rigs.
Henderson, Nevada is served by 70 public electric vehicle charging locations operating 194 individual chargers — an average of 2.8 chargers per site. Of those locations, 13 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 57 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Henderson is ChargePoint Network with 52 locations, followed by Blink Network with 9. Average DC fast power across the city is approximately 126 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Henderson and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Henderson
Henderson, Nevada, presents a unique charging landscape largely shaped by ChargePoint Network, which operates 74% of the 70 public charging spots in the city. This concentration provides reliability but also means that competitive site developers should take note of uptime and pricing structures dictated by a single operator. With 13 DC fast charging sites averaging 125 kW—and a notable 38% rated at 150 kW or higher—new entrants offering 150-350 kW capabilities can attract drivers looking for faster options. Additionally, the mix of 19% DC fast stations with the majority focusing on Level 2 charging highlights a diverse demand, making it essential for operators to consider local traffic patterns and the existing grid to effectively fill service gaps.
Henderson charging by the numbers
Locations
70
Chargers
194
DC Fast locations
13
Level 2 locations
57
DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 2.8. Average DC fast power: 126 kW.
Henderson charging — local snapshot
Top operator share
ChargePoint Network runs 74% of public locations across 8 networks.
Average DC fast power
126 kW (fastest stall: 350 kW)
High-power share
38% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 70 locations
Estimated DC ports
68 fast-charging ports city-wide
Charging networks in Henderson
The following operators run public charging in Henderson, ranked by number of locations.
ChargePoint Network — 52 locations
Blink Network — 9 locations
Tesla — 3 locations
Non-Networked — 2 locations
Tesla Destination — 1 location
EV Connect — 1 location
FORD_CHARGE — 1 location
Electrify America — 1 location
Featured charging locations in Henderson
A selection of higher-power public charging locations across Henderson, sorted by power level.
Walmart 2838 (Henderson, NV) — Henderson, NV, 89014 (Electrify America · DC Fast · 350 kW)
M Resort - Tesla Supercharger — Henderson, NV, 89044 (Tesla · DC Fast · 250 kW)
Green Valley Ranch - Tesla Supercharger — Henderson, NV, 89052 (Tesla · DC Fast · 250 kW)
Ford Country — Henderson, NV, 89014 (FORD_CHARGE · DC Fast · 240 kW)
Railroad Pass Hotel and Casino Travel Center - Tesla Supercharger — Henderson, NV, 89002 (Tesla · DC Fast · 150 kW)
L541 CPE250-PUBLIC-1 — Henderson, NV, 89015 (ChargePoint Network · DC Fast · 62.5 kW)
HEMBN CHARGER 2 — Henderson, NV, 89014 (ChargePoint Network · DC Fast · 62.5 kW)
L541 CPE250-SERVICE1 — Henderson, NV, 89015 (ChargePoint Network · DC Fast · 62.5 kW)
HEMBN CHARGER 1 — Henderson, NV, 89014 (ChargePoint Network · DC Fast · 62.5 kW)
B&D PROP MGMT 2625 ST ROSE — Henderson, NV, 89052 (ChargePoint Network · DC Fast · 50 kW)
B&D PROP MGMT 2645 ST ROSE — Henderson, NV, 89052 (ChargePoint Network · DC Fast · 50 kW)
JLR HENDERSON ABB 01 — Henderson, NV, 89014 (ChargePoint Network · DC Fast · 24 kW)
Nearby cities with EV charging coverage
Other cities in Nevada we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Henderson specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 13 DC fast and 57 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Henderson, Nevada?
There are 70 public electric vehicle charging locations in Henderson, Nevada, with a combined 194 individual chargers. 13 locations offer DC fast charging and 57 provide Level 2 charging.
What is the largest EV charging network in Henderson?
ChargePoint Network operates the most public charging locations in Henderson with 52 sites, followed by Blink Network with 9 sites.
How much does it cost to install an EV charger in Henderson?
Level 2 EV chargers in Henderson typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Henderson?
Most Henderson projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Nevada state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Henderson?
A typical commercial Level 2 installation in Henderson energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Henderson take to become profitable?
Payback in Henderson depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.