Install EV chargers or analyze a site in Cherry Hill, New Jersey. 14 existing public charging locations (4 DC fast, 10 Level 2). Free 0–100 profitability score on any Cherry Hill address from EV Data Map by Charge Rigs.
Cherry Hill, New Jersey is served by 14 public electric vehicle charging locations operating 48 individual chargers — an average of 3.4 chargers per site. Of those locations, 4 (29%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (71%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Cherry Hill is ChargePoint Network with 10 locations, followed by APPLEGREEN with 1. Average DC fast power across the city is approximately 350 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Cherry Hill and receive an instant ROI score, demand projection, and recommended charger configuration.
In Cherry Hill, New Jersey, the public EV charging landscape is significantly shaped by ChargePoint Network, which operates 71% of the 14 public locations, ensuring a high level of reliability and convenience for users. With 29% of these sites featuring DC fast chargers, including an impressive average power of 350 kW and a peak at 400 kW, the city offers some of the fastest charging options available. This infrastructure advantage positions new entrants who implement competitive 150–350 kW stations well within the regional power spectrum. Additionally, with 27 DC fast ports spread across the city, and the mix of Level 2 charging options catering to longer dwell times, developers have a unique opportunity to identify service gaps and strategically position their offerings in relation to Cherry Hill's advanced charging network.
DC fast share: 29% of locations. Level 2 share: 71%. Average chargers per site: 3.4. Average DC fast power: 350 kW.
The following operators run public charging in Cherry Hill, ranked by number of locations.
A selection of higher-power public charging locations across Cherry Hill, sorted by power level.
Other cities in New Jersey we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Cherry Hill specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.