Install EV Chargers in Cherry Hill, New Jersey

Install EV chargers or analyze a site in Cherry Hill, New Jersey. 14 existing public charging locations (4 DC fast, 10 Level 2). Free 0–100 profitability score on any Cherry Hill address from EV Data Map by Charge Rigs.

Cherry Hill, New Jersey is served by 14 public electric vehicle charging locations operating 48 individual chargers — an average of 3.4 chargers per site. Of those locations, 4 (29%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (71%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Cherry Hill is ChargePoint Network with 10 locations, followed by APPLEGREEN with 1. Average DC fast power across the city is approximately 350 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Cherry Hill and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Cherry Hill

In Cherry Hill, New Jersey, the public EV charging landscape is significantly shaped by ChargePoint Network, which operates 71% of the 14 public locations, ensuring a high level of reliability and convenience for users. With 29% of these sites featuring DC fast chargers, including an impressive average power of 350 kW and a peak at 400 kW, the city offers some of the fastest charging options available. This infrastructure advantage positions new entrants who implement competitive 150–350 kW stations well within the regional power spectrum. Additionally, with 27 DC fast ports spread across the city, and the mix of Level 2 charging options catering to longer dwell times, developers have a unique opportunity to identify service gaps and strategically position their offerings in relation to Cherry Hill's advanced charging network.

Cherry Hill charging by the numbers

Locations
14
Chargers
48
DC Fast locations
4
Level 2 locations
10

DC fast share: 29% of locations. Level 2 share: 71%. Average chargers per site: 3.4. Average DC fast power: 350 kW.

Cherry Hill charging — local snapshot

Top operator share
ChargePoint Network runs 71% of public locations across 5 networks.
Average DC fast power
350 kW (fastest stall: 400 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
29% DC fast / 71% Level 2 across 14 locations
Estimated DC ports
27 fast-charging ports city-wide

Charging networks in Cherry Hill

The following operators run public charging in Cherry Hill, ranked by number of locations.

Featured charging locations in Cherry Hill

A selection of higher-power public charging locations across Cherry Hill, sorted by power level.

  1. Walt Whitman Service Plaza — Cherry Hill, NJ, 08034 (APPLEGREEN · DC Fast · 400 kW)
  2. Cherry Hill, NJ Rechargery @ Wawa - Marlton Pike East — Cherry Hill, NJ, 08003 (IONNA · DC Fast · 400 kW)
  3. Target T1085 (Cherry Hill, NJ) — Cherry Hill, NJ, 08002 (Electrify America · DC Fast · 350 kW)
  4. Wawa - Tesla Supercharger — Cherry Hill, NJ, 08002 (Tesla · DC Fast · 250 kW)
  5. CAMDEN COUNTY CHERRY HILL PS2 — Cherry Hill, NJ, 08003 (ChargePoint Network · Level 2 · 6.5 kW)
  6. CHMB STATION 3 — Cherry Hill, NJ, 08002 (ChargePoint Network · Level 2 · 6.5 kW)
  7. CHMB STATION 1 — Cherry Hill, NJ, 08002 (ChargePoint Network · Level 2 · 6.5 kW)
  8. THOM JEFFERSON CH2C — Cherry Hill, NJ, 08002 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CHMB STATION 5 — Cherry Hill, NJ, 08002 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CAMDEN COUNTY CHERRY HILL PS1 — Cherry Hill, NJ, 08003 (ChargePoint Network · Level 2 · 6.5 kW)
  11. THOM JEFFERSON CH2B — Cherry Hill, NJ, 08002 (ChargePoint Network · Level 2 · 6.5 kW)
  12. CHMB STATION 4 — Cherry Hill, NJ, 08002 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New Jersey we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Cherry Hill specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Cherry Hill, New Jersey?
There are 14 public electric vehicle charging locations in Cherry Hill, New Jersey, with a combined 48 individual chargers. 4 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Cherry Hill?
ChargePoint Network operates the most public charging locations in Cherry Hill with 10 sites, followed by APPLEGREEN with 1 sites.
How much does it cost to install an EV charger in Cherry Hill?
Level 2 EV chargers in Cherry Hill typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Cherry Hill?
Most Cherry Hill projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New Jersey state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Cherry Hill?
A typical commercial Level 2 installation in Cherry Hill energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Cherry Hill take to become profitable?
Payback in Cherry Hill depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.