Install EV Chargers in Edison, New Jersey

Install EV chargers or analyze a site in Edison, New Jersey. 32 existing public charging locations (4 DC fast, 28 Level 2). Free 0–100 profitability score on any Edison address from EV Data Map by Charge Rigs.

Edison, New Jersey is served by 32 public electric vehicle charging locations operating 97 individual chargers — an average of 3.0 chargers per site. Of those locations, 4 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 28 (88%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Edison is ChargePoint Network with 25 locations, followed by Tesla with 2. Average DC fast power across the city is approximately 263 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Edison and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Edison

Edison, New Jersey boasts a robust EV charging infrastructure, with ChargePoint Network leading the way, operating 78% of the 32 public charging stations. This concentration means developers must consider the reliability and pricing tied to a single operator while exploring the local market. With an impressive average power output of 263 kW and the fastest stall reaching 350 kW, Edison's four DC fast locations provide some of the quickest charging options available, catering to demand for ultra-fast charging. The predominance of Level 2 stations reflects a diverse charging strategy, addressing both immediate and longer-dwell needs. As such, identifying opportunities for additional DC fast ports can strategically position new sites against this high-performing landscape.

Edison charging by the numbers

Locations
32
Chargers
97
DC Fast locations
4
Level 2 locations
28

DC fast share: 13% of locations. Level 2 share: 88%. Average chargers per site: 3.0. Average DC fast power: 263 kW.

Edison charging — local snapshot

Top operator share
ChargePoint Network runs 78% of public locations across 7 networks.
Average DC fast power
263 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 32 locations
Estimated DC ports
40 fast-charging ports city-wide

Charging networks in Edison

The following operators run public charging in Edison, ranked by number of locations.

Featured charging locations in Edison

A selection of higher-power public charging locations across Edison, sorted by power level.

  1. Milbrook Edison Mall (Edison, NJ) — Edison, NJ, 08817 (Electrify America · DC Fast · 350 kW)
  2. Wawa - Tesla Supercharger — Edison, NJ, 08817 (Tesla · DC Fast · 250 kW)
  3. Menlo Park Mall - Tesla Supercharger — Edison, NJ, 08837 (Tesla · DC Fast · 250 kW)
  4. Menlo Park Mall — Edison, NJ, 08837 (eVgo Network · DC Fast · 200 kW)
  5. OR VOLVO STN 7 PRIVATE — Edison, NJ, 08817 (ChargePoint Network · Level 2 · 12 kW)
  6. OR VOLVO STN 10 PRIVATE — Edison, NJ, 08817 (ChargePoint Network · Level 2 · 12 kW)
  7. OR VOLVO STN 8 PRIVATE — Edison, NJ, 08817 (ChargePoint Network · Level 2 · 12 kW)
  8. Garden Homes - Millbrook Village North — Edison, NJ, 08817 (OpConnect · Level 2 · 7.7 kW)
  9. EV STATION # JCC STATION 2 — Edison, NJ, 08820 (ChargePoint Network · Level 2 · 7.7 kW)
  10. EV STATION # JCC 8 — Edison, NJ, 08820 (ChargePoint Network · Level 2 · 7.7 kW)
  11. EV STATION # JCC STATION 3 — Edison, NJ, 08820 (ChargePoint Network · Level 2 · 7.7 kW)
  12. EV STATION # JCC 5 — Edison, NJ, 08820 (ChargePoint Network · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in New Jersey we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Edison specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 28 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Edison, New Jersey?
There are 32 public electric vehicle charging locations in Edison, New Jersey, with a combined 97 individual chargers. 4 locations offer DC fast charging and 28 provide Level 2 charging.
What is the largest EV charging network in Edison?
ChargePoint Network operates the most public charging locations in Edison with 25 sites, followed by Tesla with 2 sites.
How much does it cost to install an EV charger in Edison?
Level 2 EV chargers in Edison typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Edison?
Most Edison projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New Jersey state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Edison?
A typical commercial Level 2 installation in Edison energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Edison take to become profitable?
Payback in Edison depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage