Install EV Chargers in Woodbridge Township, New Jersey

Install EV chargers or analyze a site in Woodbridge Township, New Jersey. 21 existing public charging locations (2 DC fast, 19 Level 2). Free 0–100 profitability score on any Woodbridge Township address from EV Data Map by Charge Rigs.

Woodbridge Township, New Jersey is served by 21 public electric vehicle charging locations operating 32 individual chargers — an average of 1.5 chargers per site. Of those locations, 2 (10%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 19 (90%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Woodbridge Township is ChargePoint Network with 21 locations. Average DC fast power across the city is approximately 63 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Woodbridge Township and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Woodbridge Township

Woodbridge Township’s public EV charging landscape offers a unique opportunity for developers, primarily due to its complete reliance on ChargePoint Network, which operates all 21 public locations, including 2 DC fast chargers. With an average DC fast power of only 63 kW and no sites at 150 kW or higher, the existing infrastructure leans towards lower charging speeds that may not meet the expectations of today’s EV drivers. This concentration and limited power capacity could present a strategic advantage for site developers looking to introduce higher-capacity chargers. Additionally, the remaining 19 Level 2 chargers cater to longer-dwell charging needs, making the area ripe for a mix of fast and convenient charging options to better serve residents and visitors alike.

Woodbridge Township charging by the numbers

Locations
21
Chargers
32
DC Fast locations
2
Level 2 locations
19

DC fast share: 10% of locations. Level 2 share: 90%. Average chargers per site: 1.5. Average DC fast power: 63 kW.

Woodbridge Township charging — local snapshot

Top operator share
ChargePoint Network runs 100% of public locations.
Average DC fast power
63 kW (fastest stall: 63 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
10% DC fast / 90% Level 2 across 21 locations
Estimated DC ports
2 fast-charging ports city-wide

Charging networks in Woodbridge Township

The following operators run public charging in Woodbridge Township, ranked by number of locations.

Featured charging locations in Woodbridge Township

A selection of higher-power public charging locations across Woodbridge Township, sorted by power level.

  1. WOODBRIDGE TWP DCFC ISELIN (1) — Woodbridge Township, NJ, 08830 (ChargePoint Network · DC Fast · 62.5 kW)
  2. WOODBRIDGE TWP DCFC ISELIN (2) — Woodbridge Township, NJ, 08830 (ChargePoint Network · DC Fast · 62.5 kW)
  3. BUILDING 4 STATION 2 — Woodbridge Township, NJ, 08830 (ChargePoint Network · Level 2 · 12 kW)
  4. BUILDING 4 STATION 2B — Woodbridge Township, NJ, 08830 (ChargePoint Network · Level 2 · 7.7 kW)
  5. WOODBRIDGE TWP NEW ST PS1 — Woodbridge Township, NJ, 07095 (ChargePoint Network · Level 2 · 6.5 kW)
  6. ATLANTIC REALTY METROTOP PG4 — Woodbridge Township, NJ, 08830 (ChargePoint Network · Level 2 · 6.5 kW)
  7. ATLANTIC REALTY METROTOP PG1 — Woodbridge Township, NJ, 08830 (ChargePoint Network · Level 2 · 6.5 kW)
  8. ATLANTIC REALTY METROTOP PG3 — Woodbridge Township, NJ, 08830 (ChargePoint Network · Level 2 · 6.5 kW)
  9. WOODBRIDGE TWP ELEANOR PL PS1 — Woodbridge Township, NJ, 07095 (ChargePoint Network · Level 2 · 6.5 kW)
  10. WOODBRIDGE TWP NEW ST PS2 — Woodbridge Township, NJ, 07095 (ChargePoint Network · Level 2 · 6.5 kW)
  11. ATLANTIC REALTY METROTOP PG2 — Woodbridge Township, NJ, 08830 (ChargePoint Network · Level 2 · 6.5 kW)
  12. METROPARK EV 2 — Woodbridge Township, NJ, 08830 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New Jersey we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Woodbridge Township specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 19 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Woodbridge Township, New Jersey?
There are 21 public electric vehicle charging locations in Woodbridge Township, New Jersey, with a combined 32 individual chargers. 2 locations offer DC fast charging and 19 provide Level 2 charging.
What is the largest EV charging network in Woodbridge Township?
ChargePoint Network operates the most public charging locations in Woodbridge Township with 21 sites.
How much does it cost to install an EV charger in Woodbridge Township?
Level 2 EV chargers in Woodbridge Township typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Woodbridge Township?
Most Woodbridge Township projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New Jersey state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Woodbridge Township?
A typical commercial Level 2 installation in Woodbridge Township energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Woodbridge Township take to become profitable?
Payback in Woodbridge Township depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage