Install EV Chargers in Kearny, New Jersey

Install EV chargers or analyze a site in Kearny, New Jersey. 12 existing public charging locations (4 DC fast, 8 Level 2). Free 0–100 profitability score on any Kearny address from EV Data Map by Charge Rigs.

Kearny, New Jersey is served by 12 public electric vehicle charging locations operating 77 individual chargers — an average of 6.4 chargers per site. Of those locations, 4 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Kearny is ChargePoint Network with 7 locations, followed by Tesla with 2. Average DC fast power across the city is approximately 251 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Kearny and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Kearny

Kearny's public EV charging landscape stands out for its competitive and diverse offering, featuring 12 locations with 5 distinct operators. ChargePoint Network leads with a robust 58% presence, ensuring competitive pricing and uptime while allowing drivers to choose based on power and amenities. The city’s DC fast charging sites are particularly impressive, boasting an average output of 251 kW and featuring ultra-fast capabilities, with all stations rated 150 kW or higher. This infrastructure positions Kearny as an optimal location for both everyday charging needs with Level 2 options and rapid turnarounds through DC fast chargers, which comprise a notable 33% of the total charging locations, effectively catering to varying driver needs.

Kearny charging by the numbers

Locations
12
Chargers
77
DC Fast locations
4
Level 2 locations
8

DC fast share: 33% of locations. Level 2 share: 67%. Average chargers per site: 6.4. Average DC fast power: 251 kW.

Kearny charging — local snapshot

Top operator share
ChargePoint Network runs 58% of public locations across 5 networks.
Average DC fast power
251 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
33% DC fast / 67% Level 2 across 12 locations
Estimated DC ports
57 fast-charging ports city-wide

Charging networks in Kearny

The following operators run public charging in Kearny, ranked by number of locations.

Featured charging locations in Kearny

A selection of higher-power public charging locations across Kearny, sorted by power level.

  1. Walmart 5447 (Kearny, NJ) — Kearny, NJ, 07032 (Electrify America · DC Fast · 350 kW)
  2. Kearny - Harrison Ave - Tesla Supercharger — Kearny, NJ, 07032 (Tesla · DC Fast · 325 kW)
  3. EV Edison Charging Hub — Kearny, NJ, 07032 (Non-Networked · DC Fast · 180 kW)
  4. Wawa - Tesla Supercharger — Kearny, NJ, 07032 (Tesla · DC Fast · 150 kW)
  5. SWTCH Energy Inc. — Kearny, NJ, 07032 (SWTCH · Level 2 · 7.2 kW)
  6. EV REQUIRED T2881 STATION 2 — Kearny, NJ, 07032 (ChargePoint Network · Level 2 · 6.5 kW)
  7. EV REQUIRED T2881 STATION 3 — Kearny, NJ, 07032 (ChargePoint Network · Level 2 · 6.5 kW)
  8. EV REQUIRED T2881 STATION 6 — Kearny, NJ, 07032 (ChargePoint Network · Level 2 · 6.5 kW)
  9. EV REQUIRED T2881 STATION 4 — Kearny, NJ, 07032 (ChargePoint Network · Level 2 · 6.5 kW)
  10. EV REQUIRED T2881 STATION 7 — Kearny, NJ, 07032 (ChargePoint Network · Level 2 · 6.5 kW)
  11. EV REQUIRED T2881 STATION 8 — Kearny, NJ, 07032 (ChargePoint Network · Level 2 · 6.5 kW)
  12. EV REQUIRED T2881 STATION 1 — Kearny, NJ, 07032 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New Jersey we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Kearny specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Kearny, New Jersey?
There are 12 public electric vehicle charging locations in Kearny, New Jersey, with a combined 77 individual chargers. 4 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Kearny?
ChargePoint Network operates the most public charging locations in Kearny with 7 sites, followed by Tesla with 2 sites.
How much does it cost to install an EV charger in Kearny?
Level 2 EV chargers in Kearny typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Kearny?
Most Kearny projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New Jersey state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Kearny?
A typical commercial Level 2 installation in Kearny energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Kearny take to become profitable?
Payback in Kearny depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage