Install EV Chargers in North Bergen, New Jersey

Install EV chargers or analyze a site in North Bergen, New Jersey. 12 existing public charging locations (5 DC fast, 7 Level 2). Free 0–100 profitability score on any North Bergen address from EV Data Map by Charge Rigs.

North Bergen, New Jersey is served by 12 public electric vehicle charging locations operating 65 individual chargers — an average of 5.4 chargers per site. Of those locations, 5 (42%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (58%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in North Bergen is ChargePoint Network with 6 locations, followed by Tesla with 3. Average DC fast power across the city is approximately 247 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in North Bergen and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in North Bergen

North Bergen boasts a robust EV charging landscape, featuring 12 public locations operated by five distinct networks, including a significant presence from ChargePoint Network. This competitive market dynamics not only enhance pricing and uptime but also allow drivers to choose their charge sites based on power and amenities rather than brand loyalty. Notably, the city’s five DC fast charging sites average an impressive 247 kW, with the fastest stall capable of delivering 350 kW—placing North Bergen among the leaders in ultra-fast charging options. With 80% of these fast sites rated at 150 kW or higher, the city caters effectively to short-stay and long-distance drivers alike, making it a strategic hub for EV infrastructure in the region.

North Bergen charging by the numbers

Locations
12
Chargers
65
DC Fast locations
5
Level 2 locations
7

DC fast share: 42% of locations. Level 2 share: 58%. Average chargers per site: 5.4. Average DC fast power: 247 kW.

North Bergen charging — local snapshot

Top operator share
ChargePoint Network runs 50% of public locations across 5 networks.
Average DC fast power
247 kW (fastest stall: 350 kW)
High-power share
80% of DC fast sites are 150 kW-class or higher
Mix
42% DC fast / 58% Level 2 across 12 locations
Estimated DC ports
47 fast-charging ports city-wide

Charging networks in North Bergen

The following operators run public charging in North Bergen, ranked by number of locations.

Featured charging locations in North Bergen

A selection of higher-power public charging locations across North Bergen, sorted by power level.

  1. Target North Bergen #T1865 — North Bergen, NJ, 07047 (eVgo Network · DC Fast · 350 kW)
  2. Wawa - Tesla Supercharger — North Bergen, NJ, 07047 (Tesla · DC Fast · 325 kW)
  3. Starbucks - Tesla Supercharger — North Bergen, NJ, 07047 (Tesla · DC Fast · 250 kW)
  4. Columbia Park Center - Tesla Supercharger — North Bergen, NJ, 07087 (Tesla · DC Fast · 250 kW)
  5. NBPA ADMIN DCFC — North Bergen, NJ, 07047 (ChargePoint Network · DC Fast · 62 kW)
  6. SWTCH Energy — North Bergen, NJ, 07047 (SWTCH · Level 2 · 8 kW)
  7. NBPA ADMIN LEVEL 2 — North Bergen, NJ, 07047 (ChargePoint Network · Level 2 · 6.5 kW)
  8. NBPA 1435 51ST L2 — North Bergen, NJ, 07047 (ChargePoint Network · Level 2 · 6.5 kW)
  9. NBPA LIBERTY L2 (2) — North Bergen, NJ, 07047 (ChargePoint Network · Level 2 · 6.5 kW)
  10. NBPA LIBERTY L2 (1) — North Bergen, NJ, 07047 (ChargePoint Network · Level 2 · 6.5 kW)
  11. NBPA 46TH ST. — North Bergen, NJ, 07047 (ChargePoint Network · Level 2 · 6.5 kW)
  12. 430805 Avalon North Bergen — North Bergen, NJ, 7047 (Blink Network · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in New Jersey we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For North Bergen specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in North Bergen, New Jersey?
There are 12 public electric vehicle charging locations in North Bergen, New Jersey, with a combined 65 individual chargers. 5 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in North Bergen?
ChargePoint Network operates the most public charging locations in North Bergen with 6 sites, followed by Tesla with 3 sites.
How much does it cost to install an EV charger in North Bergen?
Level 2 EV chargers in North Bergen typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in North Bergen?
Most North Bergen projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New Jersey state, utility and NEVI-funded programs.
How long does it take to install an EV charger in North Bergen?
A typical commercial Level 2 installation in North Bergen energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in North Bergen take to become profitable?
Payback in North Bergen depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.