Install EV Chargers in Bedford Hills, New York

Install EV chargers or analyze a site in Bedford Hills, New York. 10 existing public charging locations (4 DC fast, 6 Level 2). Free 0–100 profitability score on any Bedford Hills address from EV Data Map by Charge Rigs.

Bedford Hills, New York is served by 10 public electric vehicle charging locations operating 18 individual chargers — an average of 1.8 chargers per site. Of those locations, 4 (40%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (60%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Bedford Hills is ChargePoint Network with 9 locations, followed by FLO with 1. Average DC fast power across the city is approximately 63 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Bedford Hills and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Bedford Hills

Bedford Hills, New York, features a public charging landscape where ChargePoint Network dominates, operating 90% of the city's 10 charging locations. With 40% classified as DC fast chargers, the average power output stands at 63 kW, reflecting a legacy infrastructure that could create opportunities for newer operators offering higher-capacity systems. Since none of the DC fast chargers reach 150 kW or above, a charging station equipped with more advanced technology could attract drivers prioritizing speed. Additionally, the dual-network environment, alongside the mix of Level 2 and fast charging, indicates potential gaps for addressing diverse charging needs in an evolving market, presenting a strategic advantage for new developers.

Bedford Hills charging by the numbers

Locations
10
Chargers
18
DC Fast locations
4
Level 2 locations
6

DC fast share: 40% of locations. Level 2 share: 60%. Average chargers per site: 1.8. Average DC fast power: 63 kW.

Bedford Hills charging — local snapshot

Top operator share
ChargePoint Network runs 90% of public locations across 2 networks.
Average DC fast power
63 kW (fastest stall: 63 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
40% DC fast / 60% Level 2 across 10 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Bedford Hills

The following operators run public charging in Bedford Hills, ranked by number of locations.

Featured charging locations in Bedford Hills

A selection of higher-power public charging locations across Bedford Hills, sorted by power level.

  1. BEDFORDCDJR CPE250 #2 — Bedford Hills, NY, 10507 (ChargePoint Network · DC Fast · 62.5 kW)
  2. BEDFORDCDJR CPE250 #1 — Bedford Hills, NY, 10507 (ChargePoint Network · DC Fast · 62.5 kW)
  3. BEDFORDCDJR CPE250 #4 — Bedford Hills, NY, 10507 (ChargePoint Network · DC Fast · 62.5 kW)
  4. BEDFORDCDJR CPE250 #3 — Bedford Hills, NY, 10507 (ChargePoint Network · DC Fast · 62.5 kW)
  5. BEDFORDEV TOWN HALL — Bedford Hills, NY, 10507 (ChargePoint Network · Level 2 · 6.5 kW)
  6. BEDFORD_EV TOWN COURT 2 — Bedford Hills, NY, 10507 (ChargePoint Network · Level 2 · 6.5 kW)
  7. BEDFORD_EV CHERRY STREET — Bedford Hills, NY, 10507 (ChargePoint Network · Level 2 · 6.5 kW)
  8. BEDFORDEV MEMORIAL PARK 2 — Bedford Hills, NY, 10507 (ChargePoint Network · Level 2 · 6.5 kW)
  9. BEDFORDEV METRO NORTH RR1 — Bedford Hills, NY, 10507 (ChargePoint Network · Level 2 · 6.5 kW)
  10. Mavis Tire Bedford Road — Bedford Hills, NY, 10507 (FLO · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Bedford Hills specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Bedford Hills, New York?
There are 10 public electric vehicle charging locations in Bedford Hills, New York, with a combined 18 individual chargers. 4 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Bedford Hills?
ChargePoint Network operates the most public charging locations in Bedford Hills with 9 sites, followed by FLO with 1 sites.
How much does it cost to install an EV charger in Bedford Hills?
Level 2 EV chargers in Bedford Hills typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Bedford Hills?
Most Bedford Hills projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Bedford Hills?
A typical commercial Level 2 installation in Bedford Hills energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Bedford Hills take to become profitable?
Payback in Bedford Hills depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage