Install EV Chargers in Tarrytown, New York

Install EV chargers or analyze a site in Tarrytown, New York. 12 existing public charging locations (1 DC fast, 11 Level 2). Free 0–100 profitability score on any Tarrytown address from EV Data Map by Charge Rigs.

Tarrytown, New York is served by 12 public electric vehicle charging locations operating 79 individual chargers — an average of 6.6 chargers per site. Of those locations, 1 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (92%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Tarrytown is ChargePoint Network with 4 locations, followed by SYNERGEV with 1. Average DC fast power across the city is approximately 150 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Tarrytown and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Tarrytown

Tarrytown boasts a competitive landscape for electric vehicle charging, with 12 public locations spread across 9 distinct networks, ensuring a diversity that enhances both pricing and uptime for users. Notably, the only DC fast charging option in the city stands at a robust 150 kW, aligning with modern high-power standards, which is essential for EV drivers prioritizing quick charging. With 100% of its DC fast sites classified at this power level, Tarrytown sets itself apart in terms of performance. The presence of multiple operators, particularly ChargePoint Network, which controls a third of the city’s charging sites, further allows drivers to choose based on charging power and amenities rather than brand loyalty, making Tarrytown an attractive option within the region.

Tarrytown charging by the numbers

Locations
12
Chargers
79
DC Fast locations
1
Level 2 locations
11

DC fast share: 8% of locations. Level 2 share: 92%. Average chargers per site: 6.6. Average DC fast power: 150 kW.

Tarrytown charging — local snapshot

Top operator share
ChargePoint Network runs 33% of public locations across 9 networks.
Average DC fast power
150 kW (fastest stall: 150 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 12 locations
Estimated DC ports
12 fast-charging ports city-wide

Charging networks in Tarrytown

The following operators run public charging in Tarrytown, ranked by number of locations.

Featured charging locations in Tarrytown

A selection of higher-power public charging locations across Tarrytown, sorted by power level.

  1. Sheraton Tarrytown Hotel - Tesla Supercharger — Tarrytown, NY, 10591 (Tesla · DC Fast · 150 kW)
  2. VOT STATION- 2 — Tarrytown, NY, 10591 (ChargePoint Network · Level 2 · 13.4 kW)
  3. VOT STATION - 1 — Tarrytown, NY, 10591 (ChargePoint Network · Level 2 · 13.4 kW)
  4. SRE Tarrytown — tarrytown, NY, 10591 (Non-Networked · Level 2 · 11.5 kW)
  5. Hudson Harbor Condominiums — Tarrytown, NY, 10591 (SYNERGEV · Level 2 · 11 kW)
  6. Lookout II Condominium — Tarrytown, NY, 10591 (Blink Network · Level 2 · 8.6 kW)
  7. Tarrytown Metro North Train Station — Tarrytown, NY, 10591 (EV Connect · Level 2 · 7.4 kW)
  8. Tarrytown House Estate on the Hudson - Tesla Destination — Tarrytown, NY, 10591 (Tesla Destination · Level 2 · 7.2 kW)
  9. Westchester Marriott Hotel - Parking Lot — Tarrytown, NY, 10591 (EVOKE · Level 2 · 7 kW)
  10. TALLYRAND TALLYRAND2 — Tarrytown, NY, 10591 (ChargePoint Network · Level 2 · 6.5 kW)
  11. TALLYRAND TALLYRAND1 — Tarrytown, NY, 10591 (ChargePoint Network · Level 2 · 6.5 kW)
  12. Mavis Tire - 400 South Broadway — Tarrytown, NY, 10591 (FLO · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Tarrytown specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Tarrytown, New York?
There are 12 public electric vehicle charging locations in Tarrytown, New York, with a combined 79 individual chargers. 1 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Tarrytown?
ChargePoint Network operates the most public charging locations in Tarrytown with 4 sites, followed by SYNERGEV with 1 sites.
How much does it cost to install an EV charger in Tarrytown?
Level 2 EV chargers in Tarrytown typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Tarrytown?
Most Tarrytown projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Tarrytown?
A typical commercial Level 2 installation in Tarrytown energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Tarrytown take to become profitable?
Payback in Tarrytown depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.