Install EV chargers or analyze a site in White Plains, New York. 40 existing public charging locations (3 DC fast, 37 Level 2). Free 0–100 profitability score on any White Plains address from EV Data Map by Charge Rigs.

White Plains, New York is served by 40 public electric vehicle charging locations operating 304 individual chargers — an average of 7.6 chargers per site. Of those locations, 3 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 37 (93%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in White Plains is FLO with 8 locations, followed by ChargePoint Network with 7. Average DC fast power across the city is approximately 257 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in White Plains and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in White Plains

White Plains boasts a distinctive public charging landscape with its 38 locations operated by 12 different networks, fostering competitive pricing and uptime. The city’s 3 DC fast charging sites stand out with an impressive average power of 257 kW and a top stall reaching 360 kW, making them among the fastest in the nation. Notably, 67% of these fast chargers exceed 150 kW capacity, catering to drivers seeking high-speed options. As a result, EV owners can choose based on power and amenities, rather than relying on a single brand. This nuanced market, complemented by a mix of Level 2 chargers for longer-dwell needs, positions White Plains as a strategic hub in the NY area for electric vehicle charging.

White Plains charging by the numbers

Locations
40
Chargers
304
DC Fast locations
3
Level 2 locations
37

DC fast share: 8% of locations. Level 2 share: 93%. Average chargers per site: 7.6. Average DC fast power: 257 kW.

White Plains charging — local snapshot

Top operator share
FLO runs 20% of public locations across 12 networks.
Average DC fast power
257 kW (fastest stall: 360 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 40 locations
Estimated DC ports
12 fast-charging ports city-wide

Charging networks in White Plains

The following operators run public charging in White Plains, ranked by number of locations.

Featured charging locations in White Plains

A selection of higher-power public charging locations across White Plains, sorted by power level.

  1. Chestnut Market Hutchinson Riv Pkwy — White Plains, NY, 10528 (NOODOE · DC Fast · 360 kW)
  2. EVolve NY White Plains — White Plains, NY, 10601 (Electrify America · DC Fast · 350 kW)
  3. White Plains Honda — White Plains, NY, 10606 (Blink Network · DC Fast · 60 kW)
  4. Heritage Tower Condominium — White Plains, NY, 10603 (Blink Network · Level 2 · 21.6 kW)
  5. Crystal Towers - Upper Garage — White Plains, NY, 10605 (Blink Network · Level 2 · 17.3 kW)
  6. Colonial Needle — White Plains, NY, 10606 (Blink Network · Level 2 · 17.3 kW)
  7. The Duet — White Plains, NY, 10605 (EVOKE · Level 2 · 11.5 kW)
  8. Crystal Towers - Lower Garage — White Plains, NY, 10605 (Blink Network · Level 2 · 8.6 kW)
  9. 240 Airport Rd — White Plains, NY, 10604 (LOOP · Level 2 · 7.7 kW)
  10. Hyatt House White Plains — White Plains, NY, 10604 (EV Connect · Level 2 · 7.4 kW)
  11. Hamilton Parking Garage — White Plains, NY, 10601 (Non-Networked · Level 2 · 7.2 kW)
  12. Lexington-Grove West Garage — White Plains, NY, 10601 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For White Plains specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 37 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in White Plains, New York?
There are 40 public electric vehicle charging locations in White Plains, New York, with a combined 304 individual chargers. 3 locations offer DC fast charging and 37 provide Level 2 charging.
What is the largest EV charging network in White Plains?
FLO operates the most public charging locations in White Plains with 8 sites, followed by ChargePoint Network with 7 sites.
How much does it cost to install an EV charger in White Plains?
Level 2 EV chargers in White Plains typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in White Plains?
Most White Plains projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in White Plains?
A typical commercial Level 2 installation in White Plains energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in White Plains take to become profitable?
Payback in White Plains depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.