Install EV Chargers in Farmington, New York

Install EV chargers or analyze a site in Farmington, New York. 13 existing public charging locations (2 DC fast, 11 Level 2). Free 0–100 profitability score on any Farmington address from EV Data Map by Charge Rigs.

Farmington, New York is served by 13 public electric vehicle charging locations operating 64 individual chargers — an average of 4.9 chargers per site. Of those locations, 2 (15%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (85%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Farmington is ChargePoint Network with 5 locations, followed by EVOKE with 2. Average DC fast power across the city is approximately 185 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Farmington and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Farmington

Farmington boasts a competitive public charging landscape with 13 locations operated by 7 distinct networks, providing drivers with diverse charging options. ChargePoint Network dominates, managing 38% of the sites, fostering competitive pricing and uptime. The city’s 2 DC fast charging stations feature an impressive average power of 185 kW, with half of the fast stations classified at 150 kW or higher, appealing to users looking for quick energy boosts. The fastest stall, at 250 kW, positions Farmington favorably for modern EV requirements, while the remaining Level 2 chargers cater to longer dwell times. This varied infrastructure allows drivers to prioritize power and amenities, making Farmington a strategic choice for EV charging in the region.

Farmington charging by the numbers

Locations
13
Chargers
64
DC Fast locations
2
Level 2 locations
11

DC fast share: 15% of locations. Level 2 share: 85%. Average chargers per site: 4.9. Average DC fast power: 185 kW.

Farmington charging — local snapshot

Top operator share
ChargePoint Network runs 38% of public locations across 7 networks.
Average DC fast power
185 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
15% DC fast / 85% Level 2 across 13 locations
Estimated DC ports
18 fast-charging ports city-wide

Charging networks in Farmington

The following operators run public charging in Farmington, ranked by number of locations.

Featured charging locations in Farmington

A selection of higher-power public charging locations across Farmington, sorted by power level.

  1. KFC - Tesla Supercharger — Farmington, NY, 14425 (Tesla · DC Fast · 250 kW)
  2. Electric Car Corner — Farmington, NY, 14425 (CHARGESMART_EV · DC Fast · 120 kW)
  3. RELIANT FCU FARMINGTON CHA1 — Farmington, NY, 14425 (ChargePoint Network · Level 2 · 19.2 kW)
  4. RELIANT FCU FARMINGTON CHA2 — Farmington, NY, 14425 (ChargePoint Network · Level 2 · 15.4 kW)
  5. Finger Lakes Hotel - Loomis Housing — Farmington, NY, 14425 (CHARGESMART_EV · Level 2 · 9.6 kW)
  6. Burger King Farmington NY — Farmington, NY, 14425 (Blink Network · Level 2 · 8.6 kW)
  7. Auto Outlets EV Corner — Farmington, NY, 14425 (Non-Networked · Level 2 · 7.6 kW)
  8. Auto Outlets of Canandaigua — Farmington, NY, 14445 (SWTCH · Level 2 · 7.2 kW)
  9. Grove Park - Upper Parking Lot — Farmington, NY, 14425 (EVOKE · Level 2 · 7 kW)
  10. Grove Park - Upper Parking Lot — Farmington, NY, 14425 (EVOKE · Level 2 · 7 kW)
  11. HOTEL LOCATION MTFRM 2 LEFT — Farmington, NY, 14425 (ChargePoint Network · Level 2 · 6.5 kW)
  12. HOTEL LOCATION MTFRM 2 RIGHT — Farmington, NY, 14425 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Farmington specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Farmington, New York?
There are 13 public electric vehicle charging locations in Farmington, New York, with a combined 64 individual chargers. 2 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Farmington?
ChargePoint Network operates the most public charging locations in Farmington with 5 sites, followed by EVOKE with 2 sites.
How much does it cost to install an EV charger in Farmington?
Level 2 EV chargers in Farmington typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Farmington?
Most Farmington projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Farmington?
A typical commercial Level 2 installation in Farmington energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Farmington take to become profitable?
Payback in Farmington depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage