Install EV Chargers in East Rochester, New York

Install EV chargers or analyze a site in East Rochester, New York. 12 existing public charging locations (2 DC fast, 10 Level 2). Free 0–100 profitability score on any East Rochester address from EV Data Map by Charge Rigs.

East Rochester, New York is served by 12 public electric vehicle charging locations operating 32 individual chargers — an average of 2.7 chargers per site. Of those locations, 2 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in East Rochester is ChargePoint Network with 7 locations, followed by EV Connect with 2. Average DC fast power across the city is approximately 110 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in East Rochester and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in East Rochester

East Rochester boasts a vibrant EV charging landscape, featuring 12 public charging locations operated by five distinct networks, with ChargePoint Network dominating at 58%. This variety fosters competitive pricing and enhances uptime, offering drivers a choice based on power and amenities rather than defaulting to a single brand. The two DC fast chargers, averaging 110 kW, represent 17% of the total charging sites, highlighting a mid-power offering in comparison to national standards. While these fast options are suitable for quick stops, the absence of higher-capacity 150 kW-class chargers creates an opportunity for new providers to enhance the local power curve and attract drivers seeking faster charging solutions. Overall, the interplay between different operators and charger types establishes East Rochester as an evolving hub for EV infrastructure.

East Rochester charging by the numbers

Locations
12
Chargers
32
DC Fast locations
2
Level 2 locations
10

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 2.7. Average DC fast power: 110 kW.

East Rochester charging — local snapshot

Top operator share
ChargePoint Network runs 58% of public locations across 5 networks.
Average DC fast power
110 kW (fastest stall: 120 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 12 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in East Rochester

The following operators run public charging in East Rochester, ranked by number of locations.

Featured charging locations in East Rochester

A selection of higher-power public charging locations across East Rochester, sorted by power level.

  1. Hoselton GM Chevrolet — East Rochester, NY, 14445 (EV Connect · DC Fast · 120 kW)
  2. Van Bortel Ford — East Rochester, NY, 14445 (FORD_CHARGE · DC Fast · 100 kW)
  3. 435 W Commercial St — East Rochester, NY, 14445 (EV Connect · Level 2 · 7.2 kW)
  4. Van Bortel Ford — East Rochester, NY, 14445 (Non-Networked · Level 2 · 7.2 kW)
  5. Van Bortel Ford - Parking Lot — East Rochester, NY, 14445 (EVOKE · Level 2 · 7 kW)
  6. HOSELTON TOYOTA TOYOTA- EV 1 — East Rochester, NY, 14445 (ChargePoint Network · Level 2 · 6.5 kW)
  7. HOSELTONCHEVY01 STATION 1 — East Rochester, NY, 14445 (ChargePoint Network · Level 2 · 6.5 kW)
  8. VOEASTROCHESTER EDMUND LYON PAR — East Rochester, NY, 14445 (ChargePoint Network · Level 2 · 6.5 kW)
  9. VOEASTROCHESTER EYER BUILDING — East Rochester, NY, 14445 (ChargePoint Network · Level 2 · 6.5 kW)
  10. VOEASTROCHESTER EAST ROCH GW1 — East Rochester, NY, 14445 (ChargePoint Network · Level 2 · 6.5 kW)
  11. VOEASTROCHESTER EYER PARK — East Rochester, NY, 14445 (ChargePoint Network · Level 2 · 6.5 kW)
  12. VOEASTROCHESTER CONCREST PARK — East Rochester, NY, 14445 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For East Rochester specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in East Rochester, New York?
There are 12 public electric vehicle charging locations in East Rochester, New York, with a combined 32 individual chargers. 2 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in East Rochester?
ChargePoint Network operates the most public charging locations in East Rochester with 7 sites, followed by EV Connect with 2 sites.
How much does it cost to install an EV charger in East Rochester?
Level 2 EV chargers in East Rochester typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in East Rochester?
Most East Rochester projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in East Rochester?
A typical commercial Level 2 installation in East Rochester energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in East Rochester take to become profitable?
Payback in East Rochester depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage