Install EV Chargers in Guilderland, New York

Install EV chargers or analyze a site in Guilderland, New York. 11 existing public charging locations (1 DC fast, 10 Level 2). Free 0–100 profitability score on any Guilderland address from EV Data Map by Charge Rigs.

Guilderland, New York is served by 11 public electric vehicle charging locations operating 58 individual chargers — an average of 5.3 chargers per site. Of those locations, 1 (9%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (91%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Guilderland is ChargePoint Network with 5 locations, followed by VIALYNK with 4. Average DC fast power across the city is approximately 150 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Guilderland and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Guilderland

Guilderland, New York, stands out for its well-distributed EV charging infrastructure, boasting 11 public locations managed by four different networks, with ChargePoint Network operating the largest share at 45%. This balance prevents monopolization, offering drivers a variety of options. Notably, the city features a single DC fast charging site that operates at a robust average of 150 kW, ensuring efficient power delivery for quick recharges. With 9% of the charging locations classified as DC fast, Guilderland caters to both rapid and longer-duration charging needs, making it an appealing choice for EV drivers. The blend of technologies and competitive operators paves the way for future advancements and increased adoption.

Guilderland charging by the numbers

Locations
11
Chargers
58
DC Fast locations
1
Level 2 locations
10

DC fast share: 9% of locations. Level 2 share: 91%. Average chargers per site: 5.3. Average DC fast power: 150 kW.

Guilderland charging — local snapshot

Top operator share
ChargePoint Network runs 45% of public locations across 4 networks.
Average DC fast power
150 kW (fastest stall: 150 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
9% DC fast / 91% Level 2 across 11 locations
Estimated DC ports
20 fast-charging ports city-wide

Charging networks in Guilderland

The following operators run public charging in Guilderland, ranked by number of locations.

Featured charging locations in Guilderland

A selection of higher-power public charging locations across Guilderland, sorted by power level.

  1. Crossgates Mall - Tesla Supercharger — Guilderland, NY, 12203 (Tesla · DC Fast · 150 kW)
  2. Guilderland Fire Department — Guilderland, NY, 12084 (EV Connect · Level 2 · 11 kW)
  3. Hamilton Square 20 Mall — Guilderland, NY, 12084 (VIALYNK · Level 2 · 7.2 kW)
  4. Deer Valley Building 3 — Guilderland, NY, 12084 (VIALYNK · Level 2 · 6.7 kW)
  5. Deer Valley Building 8 — Guilderland, NY, 12084 (VIALYNK · Level 2 · 6.7 kW)
  6. Deer Valley Building 4 — Guilderland, NY, 12084 (VIALYNK · Level 2 · 6.7 kW)
  7. BURNS MGT HV 2 — Guilderland, NY, 12084 (ChargePoint Network · Level 2 · 6.5 kW)
  8. BURNS MGT HV 3 — Guilderland, NY, 12084 (ChargePoint Network · Level 2 · 6.5 kW)
  9. BURNS MGT HV 5 — Guilderland, NY, 12203 (ChargePoint Network · Level 2 · 6.5 kW)
  10. BURNS MGT HV 4 — Guilderland, NY, 12203 (ChargePoint Network · Level 2 · 6.5 kW)
  11. BURNS MGT HV 1 — Guilderland, NY, 12084 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Guilderland specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Guilderland, New York?
There are 11 public electric vehicle charging locations in Guilderland, New York, with a combined 58 individual chargers. 1 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Guilderland?
ChargePoint Network operates the most public charging locations in Guilderland with 5 sites, followed by VIALYNK with 4 sites.
How much does it cost to install an EV charger in Guilderland?
Level 2 EV chargers in Guilderland typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Guilderland?
Most Guilderland projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Guilderland?
A typical commercial Level 2 installation in Guilderland energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Guilderland take to become profitable?
Payback in Guilderland depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.