Install EV Chargers in Vestal, New York

Install EV chargers or analyze a site in Vestal, New York. 17 existing public charging locations (6 DC fast, 11 Level 2). Free 0–100 profitability score on any Vestal address from EV Data Map by Charge Rigs.

Vestal, New York is served by 17 public electric vehicle charging locations operating 51 individual chargers — an average of 3.0 chargers per site. Of those locations, 6 (35%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (65%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Vestal is ChargePoint Network with 10 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 83 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Vestal and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Vestal

Vestal, New York, boasts a diverse public charging landscape with 17 locations featuring six distinct networks, making it a competitive market for EV charging. ChargePoint Network dominates with 59% of the sites, fostering competitive pricing and uptime. The city’s six DC fast charging stations average 83 kW, with the fastest stall at 180 kW; however, only 17% of these sites reach 150 kW and above. This mix highlights the need for new entrants offering higher power options to meet driver preferences, as EV users often prioritize charging speed and amenities. Additionally, with 11 Level 2 chargers catering to longer-dwell needs, Vestal effectively balances immediate charging solutions with sustained community access.

Vestal charging by the numbers

Locations
17
Chargers
51
DC Fast locations
6
Level 2 locations
11

DC fast share: 35% of locations. Level 2 share: 65%. Average chargers per site: 3.0. Average DC fast power: 83 kW.

Vestal charging — local snapshot

Top operator share
ChargePoint Network runs 59% of public locations across 6 networks.
Average DC fast power
83 kW (fastest stall: 180 kW)
High-power share
17% of DC fast sites are 150 kW-class or higher
Mix
35% DC fast / 65% Level 2 across 17 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in Vestal

The following operators run public charging in Vestal, ranked by number of locations.

Featured charging locations in Vestal

A selection of higher-power public charging locations across Vestal, sorted by power level.

  1. Courtyard by Marriott Binghamton — Vestal, NY, 13850 (EVGATEWAY · DC Fast · 180 kW)
  2. Burr Truck Level 3 DC Fast Charge — Vestal, NY, 13850 (EV Connect · DC Fast · 120 kW)
  3. MILLER MOTORS EAST R DK — Vestal, NY, 13850 (ChargePoint Network · DC Fast · 62.5 kW)
  4. MILLER MOTORS WEST RDK — Vestal, NY, 13850 (ChargePoint Network · DC Fast · 62.5 kW)
  5. Matthews Cadillac — VESTAL, NY, 13850 (EV Connect · DC Fast · 50 kW)
  6. MATTHEW IMPORT ABB STATION 1 — Vestal, NY, 13850 (ChargePoint Network · DC Fast · 24 kW)
  7. MATTHEW IMPORT STATION 1 — Vestal, NY, 13850 (ChargePoint Network · Level 2 · 12 kW)
  8. Tru by Hilton Binghamton Vestal — Vestal, NY, 13850 (CHARGESMART_EV · Level 2 · 9.6 kW)
  9. Matthews Mitsubishi — Vestal, NY, 13850 (Non-Networked · Level 2 · 7.2 kW)
  10. Binghamton University Smart Energy Building — Vestal, NY, 13850 (Non-Networked · Level 2 · 7.2 kW)
  11. The Hearth At Castle Gardens — Vestal, NY, 13850 (VIALYNK · Level 2 · 6.7 kW)
  12. CANDLE PARK-03 — Vestal, NY, 13850 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Vestal specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Vestal, New York?
There are 17 public electric vehicle charging locations in Vestal, New York, with a combined 51 individual chargers. 6 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Vestal?
ChargePoint Network operates the most public charging locations in Vestal with 10 sites, followed by Non-Networked with 2 sites.
How much does it cost to install an EV charger in Vestal?
Level 2 EV chargers in Vestal typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Vestal?
Most Vestal projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Vestal?
A typical commercial Level 2 installation in Vestal energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Vestal take to become profitable?
Payback in Vestal depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage