Install EV Chargers in Watervliet, New York

Install EV chargers or analyze a site in Watervliet, New York. 25 existing public charging locations (0 DC fast, 25 Level 2). Free 0–100 profitability score on any Watervliet address from EV Data Map by Charge Rigs.

Watervliet, New York is served by 25 public electric vehicle charging locations operating 52 individual chargers — an average of 2.1 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 25 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Watervliet is ChargePoint Network with 24 locations, followed by VIALYNK with 1. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Watervliet and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Watervliet

Watervliet, New York, presents a unique landscape for EV charging with its 25 public locations exclusively offering Level 2 chargers, creating a significant gap for DC fast charging options. With ChargePoint Network dominating 96% of these sites, operators must consider how this reliance on a single provider impacts availability and pricing stability. Currently, the entire city lacks any DC fast chargers, which means local drivers looking for quick top-ups are forced to travel outside city limits. This essential gap in fast charging infrastructure presents a prime opportunity for new developments to cater to the increasing demand for faster charging solutions, especially as regional competitors like Troy and Albany begin to diversify their offerings.

Watervliet charging by the numbers

Locations
25
Chargers
52
DC Fast locations
0
Level 2 locations
25

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.1. Average DC fast power: 0 kW.

Watervliet charging — local snapshot

Top operator share
ChargePoint Network runs 96% of public locations across 2 networks.
Mix
0% DC fast / 100% Level 2 across 25 locations

Charging networks in Watervliet

The following operators run public charging in Watervliet, ranked by number of locations.

Featured charging locations in Watervliet

A selection of higher-power public charging locations across Watervliet, sorted by power level.

  1. Sheehy Manor — Watervliet, NY, 12189 (VIALYNK · Level 2 · 6.7 kW)
  2. WATERVLIET PARK 1 — Watervliet, NY, 12189 (ChargePoint Network · Level 2 · 6.5 kW)
  3. WATERVLIET PARK 2 — Watervliet, NY, 12189 (ChargePoint Network · Level 2 · 6.5 kW)
  4. WATERVLIET PARK 3 — Watervliet, NY, 12189 (ChargePoint Network · Level 2 · 6.5 kW)
  5. WATERVLIET DOME 1 — Watervliet, NY, 12189 (ChargePoint Network · Level 2 · 6.5 kW)
  6. COLE GROUP HIGHLAND 3 — Watervliet, NY, 12189 (ChargePoint Network · Level 2 · 6.5 kW)
  7. COLE GROUP HIGHLAND 1 — Watervliet, NY, 12189 (ChargePoint Network · Level 2 · 6.5 kW)
  8. WATERVLIET MUSEUM 1 — Watervliet, NY, 12189 (ChargePoint Network · Level 2 · 6.5 kW)
  9. HUDSON PRESERVE BLDG 12 #10 — Watervliet, NY, 12189 (ChargePoint Network · Level 2 · 6.5 kW)
  10. COLE GROUP HIGHLAND 2 — Watervliet, NY, 12189 (ChargePoint Network · Level 2 · 6.5 kW)
  11. HUDSON PRESERVE BLDG 2 #6 — Watervliet, NY, 12189 (ChargePoint Network · Level 2 · 6.5 kW)
  12. HUDSON PRESERVE BLDG 22 #3 — Watervliet, NY, 12189 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Watervliet specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 25 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Watervliet, New York?
There are 25 public electric vehicle charging locations in Watervliet, New York, with a combined 52 individual chargers. 0 locations offer DC fast charging and 25 provide Level 2 charging.
What is the largest EV charging network in Watervliet?
ChargePoint Network operates the most public charging locations in Watervliet with 24 sites, followed by VIALYNK with 1 sites.
How much does it cost to install an EV charger in Watervliet?
Level 2 EV chargers in Watervliet typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Watervliet?
Most Watervliet projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Watervliet?
A typical commercial Level 2 installation in Watervliet energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Watervliet take to become profitable?
Payback in Watervliet depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage