Install EV Chargers in Mooresville, North Carolina
Install EV chargers or analyze a site in Mooresville, North Carolina. 12 existing public charging locations (2 DC fast, 10 Level 2). Free 0–100 profitability score on any Mooresville address from EV Data Map by Charge Rigs.
Mooresville, North Carolina is served by 12 public electric vehicle charging locations operating 42 individual chargers — an average of 3.5 chargers per site. Of those locations, 2 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Mooresville is ChargePoint Network with 4 locations, followed by Tesla Destination with 2. Average DC fast power across the city is approximately 150 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Mooresville and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Mooresville
Mooresville boasts a vibrant EV charging infrastructure with a total of 12 public locations featuring a strong blend of services, including two DC fast charging stations that average 150 kW—anchored by a peak power level of 250 kW. With a diverse array of seven charging networks, including ChargePoint, which operates a third of the sites, users benefit from competitive pricing and uptime. This variety also encourages intentional site selection, as drivers prioritize power and amenities from different operators. Notably, half of the DC fast stations offer 150 kW or higher, positioning Mooresville as a key player in the region's charging ecosystem, particularly for EV drivers seeking robust power options.
Mooresville charging by the numbers
Locations
12
Chargers
42
DC Fast locations
2
Level 2 locations
10
DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 3.5. Average DC fast power: 150 kW.
Mooresville charging — local snapshot
Top operator share
ChargePoint Network runs 33% of public locations across 7 networks.
Average DC fast power
150 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 12 locations
Estimated DC ports
13 fast-charging ports city-wide
Charging networks in Mooresville
The following operators run public charging in Mooresville, ranked by number of locations.
ChargePoint Network — 4 locations
Tesla Destination — 2 locations
Non-Networked — 2 locations
Tesla — 1 location
EV Connect — 1 location
LOOP — 1 location
Blink Network — 1 location
Featured charging locations in Mooresville
A selection of higher-power public charging locations across Mooresville, sorted by power level.
Lowes Foods - Tesla Supercharger — Mooresville, NC, 28117 (Tesla · DC Fast · 250 kW)
Randy Marion Cadillac — Mooresville, NC, 28117 (EV Connect · DC Fast · 50 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Mooresville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Mooresville, North Carolina?
There are 12 public electric vehicle charging locations in Mooresville, North Carolina, with a combined 42 individual chargers. 2 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Mooresville?
ChargePoint Network operates the most public charging locations in Mooresville with 4 sites, followed by Tesla Destination with 2 sites.
How much does it cost to install an EV charger in Mooresville?
Level 2 EV chargers in Mooresville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Mooresville?
Most Mooresville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with North Carolina state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Mooresville?
A typical commercial Level 2 installation in Mooresville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Mooresville take to become profitable?
Payback in Mooresville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.