Install EV chargers or analyze a site in Mooresville, North Carolina. 12 existing public charging locations (2 DC fast, 10 Level 2). Free 0–100 profitability score on any Mooresville address from EV Data Map by Charge Rigs.
Mooresville, North Carolina is served by 12 public electric vehicle charging locations operating 42 individual chargers — an average of 3.5 chargers per site. Of those locations, 2 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Mooresville is ChargePoint Network with 4 locations, followed by Tesla Destination with 2. Average DC fast power across the city is approximately 150 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Mooresville and receive an instant ROI score, demand projection, and recommended charger configuration.
Mooresville exhibits a notably competitive public charging landscape, with a total of 12 locations served by seven distinct operators, led by ChargePoint Network at 33% of sites. The presence of both DC fast and Level 2 chargers allows drivers to choose from different power levels and amenities, enhancing the user experience. With an impressive average power of 150 kW for DC fast chargers—half of which exceed this output—Mooresville remains well-equipped to meet the needs of diverse EV drivers. The fastest stall reaching 250 kW further positions the city favorably in the high-power charging arena, making it an attractive stop for those traveling along nearby routes. This strategic mix of charging options ensures that Mooresville can effectively address both immediate fast-charging needs and longer dwell-time requirements.
DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 3.5. Average DC fast power: 150 kW.
The following operators run public charging in Mooresville, ranked by number of locations.
A selection of higher-power public charging locations across Mooresville, sorted by power level.
Other cities in North Carolina we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Mooresville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.