Install EV Chargers in Huntersville, North Carolina

Install EV chargers or analyze a site in Huntersville, North Carolina. 16 existing public charging locations (3 DC fast, 13 Level 2). Free 0–100 profitability score on any Huntersville address from EV Data Map by Charge Rigs.

Huntersville, North Carolina is served by 16 public electric vehicle charging locations operating 39 individual chargers — an average of 2.4 chargers per site. Of those locations, 3 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Huntersville is ChargePoint Network with 9 locations, followed by Blink Network with 5. Average DC fast power across the city is approximately 147 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Huntersville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Huntersville

Huntersville, North Carolina, features a balanced mix of EV charging infrastructure with 16 public locations, including 3 DC fast chargers. Approximately 19% of these locations offer rapid charging capabilities, making the city a practical choice for EV drivers seeking quick top-ups on the go. The average power output of 147 kW, along with a notable 33% of DC fast chargers classified at 150 kW or higher, indicates a commitment to efficient charging solutions. As ChargePoint Network leads with over half of the sites, new operators could strategically enhance the landscape by introducing higher-capacity chargers to meet evolving driver needs. This combination of factors positions Huntersville as an attractive market for future development in EV charging infrastructure.

Huntersville charging by the numbers

Locations
16
Chargers
39
DC Fast locations
3
Level 2 locations
13

DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 2.4. Average DC fast power: 147 kW.

Huntersville charging — local snapshot

Top operator share
ChargePoint Network runs 56% of public locations across 3 networks.
Average DC fast power
147 kW (fastest stall: 200 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 16 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Huntersville

The following operators run public charging in Huntersville, ranked by number of locations.

Featured charging locations in Huntersville

A selection of higher-power public charging locations across Huntersville, sorted by power level.

  1. HUNTERSVILLE HUNTERSVILE BP — Huntersville, NC, 28078 (ChargePoint Network · DC Fast · 200 kW)
  2. HUNTERSVILLEFRD LEVEL3 CHARGER1 — Huntersville, NC, 28078 (ChargePoint Network · DC Fast · 120 kW)
  3. HUNTERSVILLEFRD LEVEL 3-1 PL — Huntersville, NC, 28078 (ChargePoint Network · DC Fast · 120 kW)
  4. Claremont Huntersville LLC — Huntersville, NC, 28078 (Blink Network · Level 2 · 19.9 kW)
  5. HUNTERSVILLEFRD LEVEL 2 CHARGER — Huntersville, NC, 28078 (ChargePoint Network · Level 2 · 19.2 kW)
  6. Lake Norman Dentistry — Huntersville, NC, 28078 (Blink Network · Level 2 · 8.6 kW)
  7. Solis Birkdale — Huntersville, NC, 28078 (Blink Network · Level 2 · 7.5 kW)
  8. Atom Power HQ — Huntersville, NC, 28078 (AMPUP · Level 2 · 7.2 kW)
  9. Town of Huntersville — Huntersville, NC, 28078 (AMPUP · Level 2 · 7.2 kW)
  10. Northlake Apartments - Building 2 — Huntersville, NC, 28078 (Blink Network · Level 2 · 6.5 kW)
  11. WNCC CONF CTR RIGHT CHARGER — Huntersville, NC, 28078 (ChargePoint Network · Level 2 · 6.5 kW)
  12. WNCC CONF CTR LEFT CHARGER — Huntersville, NC, 28078 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in North Carolina we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Huntersville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Huntersville, North Carolina?
There are 16 public electric vehicle charging locations in Huntersville, North Carolina, with a combined 39 individual chargers. 3 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Huntersville?
ChargePoint Network operates the most public charging locations in Huntersville with 9 sites, followed by Blink Network with 5 sites.
How much does it cost to install an EV charger in Huntersville?
Level 2 EV chargers in Huntersville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Huntersville?
Most Huntersville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with North Carolina state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Huntersville?
A typical commercial Level 2 installation in Huntersville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Huntersville take to become profitable?
Payback in Huntersville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.