Install EV Chargers in Centerville, Ohio

Install EV chargers or analyze a site in Centerville, Ohio. 12 existing public charging locations (2 DC fast, 10 Level 2). Free 0–100 profitability score on any Centerville address from EV Data Map by Charge Rigs.

Centerville, Ohio is served by 12 public electric vehicle charging locations operating 26 individual chargers — an average of 2.2 chargers per site. Of those locations, 2 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Centerville is ChargePoint Network with 5 locations, followed by Blink Network with 3. Average DC fast power across the city is approximately 156 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Centerville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Centerville

Centerville, Ohio, stands out with its balanced EV charging infrastructure, featuring 12 public locations that include 2 DC fast chargers, which make up 17% of the total. Unique to this region, these DC fast chargers average a robust 156 kW, with one site capable of delivering up to 250 kW. This high-power capability is noteworthy, as half of the DC fast sites surpass the 150 kW mark, positioning Centerville as an attractive destination for EV drivers seeking rapid charging options. With four distinct networks operating, primarily dominated by ChargePoint, the city offers a diverse charging landscape that strategically caters to both quick stops and longer stays, making it ripe for further development and investment in EV infrastructure.

Centerville charging by the numbers

Locations
12
Chargers
26
DC Fast locations
2
Level 2 locations
10

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 2.2. Average DC fast power: 156 kW.

Centerville charging — local snapshot

Top operator share
ChargePoint Network runs 42% of public locations across 4 networks.
Average DC fast power
156 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 12 locations
Estimated DC ports
2 fast-charging ports city-wide

Charging networks in Centerville

The following operators run public charging in Centerville, ranked by number of locations.

Featured charging locations in Centerville

A selection of higher-power public charging locations across Centerville, sorted by power level.

  1. VOSS STATION VOSS 1 — Centerville, OH, 45459 (ChargePoint Network · DC Fast · 250 kW)
  2. ACURA OF DAYTON AD EXPRESS 250 — Centerville, OH, 45459 (ChargePoint Network · DC Fast · 62.5 kW)
  3. Dogwood Commons — Centerville, OH, 45440 (Blink Network · Level 2 · 8.3 kW)
  4. City of Centerville - City Hall — Centerville, OH, 45458 (Non-Networked · Level 2 · 7.2 kW)
  5. MVRPC(EV#7) — Centerville, OH, 45458 (Blink Network · Level 2 · 6.7 kW)
  6. MVRPC(EV#4) — Centerville, OH, 45459 (Blink Network · Level 2 · 6.7 kW)
  7. Miami Valley Hospital South. - Parking Garage Top Deck — Centerville, OH, 45459 (Non-Networked · Level 2 · 6.6 kW)
  8. Miami Valley Hospital South - Parking Lot D1 — Centerville, OH, 45459 (Non-Networked · Level 2 · 6.6 kW)
  9. 100 WEST SV STATION 1 — Centerville, OH, 45459 (ChargePoint Network · Level 2 · 6.5 kW)
  10. 100 WEST SV STATION 2 — Centerville, OH, 45459 (ChargePoint Network · Level 2 · 6.5 kW)
  11. 100 WEST SV MUNI STATION 1 — Centerville, OH, 45458 (ChargePoint Network · Level 2 · 6.5 kW)
  12. Allure — Centerville, OH, 45459 (FLO · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Centerville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Centerville, Ohio?
There are 12 public electric vehicle charging locations in Centerville, Ohio, with a combined 26 individual chargers. 2 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Centerville?
ChargePoint Network operates the most public charging locations in Centerville with 5 sites, followed by Blink Network with 3 sites.
How much does it cost to install an EV charger in Centerville?
Level 2 EV chargers in Centerville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Centerville?
Most Centerville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Ohio state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Centerville?
A typical commercial Level 2 installation in Centerville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Centerville take to become profitable?
Payback in Centerville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage