Install EV Chargers in Troy, Ohio

Install EV chargers or analyze a site in Troy, Ohio. 12 existing public charging locations (3 DC fast, 9 Level 2). Free 0–100 profitability score on any Troy address from EV Data Map by Charge Rigs.

Troy, Ohio is served by 12 public electric vehicle charging locations operating 38 individual chargers — an average of 3.2 chargers per site. Of those locations, 3 (25%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (75%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Troy is Blink Network with 4 locations, followed by ChargePoint Network with 2. Average DC fast power across the city is approximately 150 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Troy and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Troy

Troy, Ohio, boasts a robust public EV charging market with 12 locations managed by six distinct operators, providing drivers with diverse options and competitive pricing. The presence of a significant DC fast charging infrastructure—three locations averaging 150 kW and a peak of 350 kW—highlights Troy's commitment to accommodating EV drivers seeking rapid recharging. Notably, one-third of these fast charging sites exceed 150 kW, positioning them favorably for high-demand users. With Blink Network leading at 33% of the market share, drivers can leverage various networks tailored to their needs. This dynamic mix not only enhances charging accessibility but also encourages a strategic approach to site selection, ensuring that Troy remains an attractive destination for EV users navigating through Ohio.

Troy charging by the numbers

Locations
12
Chargers
38
DC Fast locations
3
Level 2 locations
9

DC fast share: 25% of locations. Level 2 share: 75%. Average chargers per site: 3.2. Average DC fast power: 150 kW.

Troy charging — local snapshot

Top operator share
Blink Network runs 33% of public locations across 6 networks.
Average DC fast power
150 kW (fastest stall: 350 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
25% DC fast / 75% Level 2 across 12 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Troy

The following operators run public charging in Troy, ranked by number of locations.

Featured charging locations in Troy

A selection of higher-power public charging locations across Troy, sorted by power level.

  1. Meijer Troy, OH #112 — Troy, OH, 45373 (eVgo Network · DC Fast · 350 kW)
  2. Chevrolet of Troy — Troy, OH, 45373 (EV Connect · DC Fast · 50 kW)
  3. Dave Arbogast Buick-GMC — TROY, OH, 45373 (EV Connect · DC Fast · 50 kW)
  4. AAA Tire and Auto Service Troy — Troy, OH, 45373 (Blink Network · Level 2 · 10.8 kW)
  5. American Honda Motor Co, Inc — Troy, OH, 45373 (AMPUP · Level 2 · 7.2 kW)
  6. Chevrolet Of Troy — Troy, OH, 45373 (Non-Networked · Level 2 · 7.2 kW)
  7. Kettering Troy Hospital — Troy, OH, 45373 (Non-Networked · Level 2 · 7.2 kW)
  8. MVRPC(EV#35) — Troy, OH, 45373 (Blink Network · Level 2 · 6.7 kW)
  9. MVRPC(EV#33) — Troy, OH, 45373 (Blink Network · Level 2 · 6.7 kW)
  10. BNC RIGHT — Troy, OH, 45373 (ChargePoint Network · Level 2 · 6.5 kW)
  11. BNC LEFT — Troy, OH, 45373 (ChargePoint Network · Level 2 · 6.5 kW)
  12. Kettering Health Troy — Troy, OH, 45373 (Blink Network · Level 2 · 5 kW)

Nearby cities with EV charging coverage

Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Troy specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Troy, Ohio?
There are 12 public electric vehicle charging locations in Troy, Ohio, with a combined 38 individual chargers. 3 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Troy?
Blink Network operates the most public charging locations in Troy with 4 sites, followed by ChargePoint Network with 2 sites.
How much does it cost to install an EV charger in Troy?
Level 2 EV chargers in Troy typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Troy?
Most Troy projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Ohio state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Troy?
A typical commercial Level 2 installation in Troy energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Troy take to become profitable?
Payback in Troy depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.