Install EV Chargers in Wilmington, Ohio

Install EV chargers or analyze a site in Wilmington, Ohio. 12 existing public charging locations (1 DC fast, 11 Level 2). Free 0–100 profitability score on any Wilmington address from EV Data Map by Charge Rigs.

Wilmington, Ohio is served by 12 public electric vehicle charging locations operating 39 individual chargers — an average of 3.3 chargers per site. Of those locations, 1 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (92%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Wilmington is SWTCH with 5 locations, followed by ChargePoint Network with 4. Average DC fast power across the city is approximately 50 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Wilmington and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Wilmington

Wilmington, Ohio offers a balanced landscape for EV charging with 12 public locations, showcasing a noteworthy diversity in network operators led by SWTCH, which manages 42% of the sites. While 8% of these facilities provide quick DC fast charging, the single station available operates at a modest 50 kW, representing an older standard in charging power. This setting creates a more stable, less monopolistic environment than cities dominated by a single provider, yet leaves room for significant upgrades as newer, higher-capacity chargers gain traction. For developers and operators, the mix of 11 Level 2 chargers caters to longer dwell times, highlighting key opportunities for enhancing the charging experience and keeping pace with evolving driver needs.

Wilmington charging by the numbers

Locations
12
Chargers
39
DC Fast locations
1
Level 2 locations
11

DC fast share: 8% of locations. Level 2 share: 92%. Average chargers per site: 3.3. Average DC fast power: 50 kW.

Wilmington charging — local snapshot

Top operator share
SWTCH runs 42% of public locations across 4 networks.
Average DC fast power
50 kW (fastest stall: 50 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 12 locations
Estimated DC ports
1 fast-charging ports city-wide

Charging networks in Wilmington

The following operators run public charging in Wilmington, ranked by number of locations.

Featured charging locations in Wilmington

A selection of higher-power public charging locations across Wilmington, sorted by power level.

  1. Bush Auto Place — Wilmington, OH, 45177 (EV Connect · DC Fast · 50 kW)
  2. ROBERTS CENTRE UNIT 002 — Wilmington, OH, 45177 (ChargePoint Network · Level 2 · 19.2 kW)
  3. ROBERTS CENTRE UNIT 001 — Wilmington, OH, 45177 (ChargePoint Network · Level 2 · 19.2 kW)
  4. Airpark Main — Wilmington, OH, 45177 (Blink Network · Level 2 · 10.4 kW)
  5. Kettering Health Wilmington — Wilmington, OH, 45177 (Blink Network · Level 2 · 10.4 kW)
  6. SWTCH Energy — Wilmington, OH, 45177 (SWTCH · Level 2 · 6.6 kW)
  7. SWTCH Energy Inc. — Wilmington, OH, 45177 (SWTCH · Level 2 · 6.6 kW)
  8. SWTCH Energy Inc. — Wilmington, OH, 45177 (SWTCH · Level 2 · 6.6 kW)
  9. SWTCH Energy — Wilmington, OH, 45177 (SWTCH · Level 2 · 6.6 kW)
  10. General Denver Hotel — Wilmington, OH, 45177 (SWTCH · Level 2 · 6.6 kW)
  11. WILMINGTON EV EV1 — Wilmington, OH, 45177 (ChargePoint Network · Level 2 · 6.5 kW)
  12. WILMINGTON EV EV2 — Wilmington, OH, 45177 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Wilmington specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Wilmington, Ohio?
There are 12 public electric vehicle charging locations in Wilmington, Ohio, with a combined 39 individual chargers. 1 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Wilmington?
SWTCH operates the most public charging locations in Wilmington with 5 sites, followed by ChargePoint Network with 4 sites.
How much does it cost to install an EV charger in Wilmington?
Level 2 EV chargers in Wilmington typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Wilmington?
Most Wilmington projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Ohio state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Wilmington?
A typical commercial Level 2 installation in Wilmington energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Wilmington take to become profitable?
Payback in Wilmington depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage