Install EV Chargers in Cincinnati, Ohio

Install EV chargers or analyze a site in Cincinnati, Ohio. 138 existing public charging locations (22 DC fast, 116 Level 2). Free 0–100 profitability score on any Cincinnati address from EV Data Map by Charge Rigs.

Cincinnati, Ohio is served by 138 public electric vehicle charging locations operating 528 individual chargers — an average of 3.8 chargers per site. Of those locations, 22 (16%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 116 (84%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Cincinnati is ChargePoint Network with 50 locations, followed by FLO with 23. Average DC fast power across the city is approximately 161 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Cincinnati and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Cincinnati

Cincinnati boasts a vibrant and competitive EV charging landscape with 138 public locations powered by 18 distinct networks, led by ChargePoint Network. This variety encourages drivers to choose charging options based on power and amenities rather than brand loyalty, making strategic site selection crucial. The city’s 22 DC fast charging stations average 161 kW, with nearly half of these sites offering 150 kW-class capabilities or higher, ensuring that drivers have access to modern, high-power charging solutions. With approximately 86 fast charging ports available, Cincinnati's infrastructure is well-positioned to cater to diverse charging needs, while the EV Data Map provides insights into optimal site placements based on local demand and traffic patterns.

Cincinnati charging by the numbers

Locations
138
Chargers
528
DC Fast locations
22
Level 2 locations
116

DC fast share: 16% of locations. Level 2 share: 84%. Average chargers per site: 3.8. Average DC fast power: 161 kW.

Cincinnati charging — local snapshot

Top operator share
ChargePoint Network runs 36% of public locations across 18 networks.
Average DC fast power
161 kW (fastest stall: 350 kW)
High-power share
45% of DC fast sites are 150 kW-class or higher
Mix
16% DC fast / 84% Level 2 across 138 locations
Estimated DC ports
86 fast-charging ports city-wide

Charging networks in Cincinnati

The following operators run public charging in Cincinnati, ranked by number of locations.

Featured charging locations in Cincinnati

A selection of higher-power public charging locations across Cincinnati, sorted by power level.

  1. Harpers Station (Cincinnati, OH) — Cincinnati, OH, 45249 (Electrify America · DC Fast · 350 kW)
  2. Brentwood Plaza — Cincinnati, OH, 45231 (eVgo Network · DC Fast · 350 kW)
  3. Meijer 223 (Cincinnati, OH) — Cincinnati, OH, 45247 (Electrify America · DC Fast · 350 kW)
  4. Western Hills Plaza — Cincinnati, OH, 45211 (eVgo Network · DC Fast · 350 kW)
  5. Meijer #224 (Cincinnati, OH) — Cincinnati, OH, 45209 (Electrify America · DC Fast · 350 kW)
  6. Meijer - Tesla Supercharger — Cincinnati, OH, 45209 (Tesla · DC Fast · 250 kW)
  7. Beechmont Ford — Cincinnati, OH, 45245 (FORD_CHARGE · DC Fast · 240 kW)
  8. Northgate CDJR — Cincinnati, OH, 45239 (Blink Network · DC Fast · 180 kW)
  9. KINGS FORD, INC FORD L3 PUBLIC1 — Cincinnati, OH, 45249 (ChargePoint Network · DC Fast · 160 kW)
  10. Meijer - Tesla Supercharger — Cincinnati, OH, 45247 (Tesla · DC Fast · 150 kW)
  11. KERRY FORD, INC FORD ISLAND #3 — Cincinnati, OH, 45246 (ChargePoint Network · DC Fast · 120 kW)
  12. KERRY FORD, INC STATION 2 — Cincinnati, OH, 45246 (ChargePoint Network · DC Fast · 120 kW)

Nearby cities with EV charging coverage

Other cities in Ohio we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Cincinnati specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 22 DC fast and 116 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Cincinnati, Ohio?
There are 138 public electric vehicle charging locations in Cincinnati, Ohio, with a combined 528 individual chargers. 22 locations offer DC fast charging and 116 provide Level 2 charging.
What is the largest EV charging network in Cincinnati?
ChargePoint Network operates the most public charging locations in Cincinnati with 50 sites, followed by FLO with 23 sites.
How much does it cost to install an EV charger in Cincinnati?
Level 2 EV chargers in Cincinnati typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Cincinnati?
Most Cincinnati projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Ohio state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Cincinnati?
A typical commercial Level 2 installation in Cincinnati energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Cincinnati take to become profitable?
Payback in Cincinnati depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.