Install EV Chargers in Ardmore, Oklahoma

Install EV chargers or analyze a site in Ardmore, Oklahoma. 10 existing public charging locations (4 DC fast, 6 Level 2). Free 0–100 profitability score on any Ardmore address from EV Data Map by Charge Rigs.

Ardmore, Oklahoma is served by 10 public electric vehicle charging locations operating 38 individual chargers — an average of 3.8 chargers per site. Of those locations, 4 (40%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (60%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Ardmore is Blink Network with 3 locations, followed by Tesla Destination with 2. Average DC fast power across the city is approximately 268 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Ardmore and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Ardmore

Ardmore stands out in terms of public EV charging infrastructure, boasting a competitive market with 10 locations featuring 6 distinct operators, primarily led by Blink Network. The city is notable for its ultra-fast DC fast charging options, averaging 268 kW, with 40% of its public facilities dedicated to this category. The predominance of high-capacity chargers—75% rated at 150 kW or higher—provides EV drivers with quick charging solutions that enhance the user experience. Additionally, the presence of multiple networks encourages competitive pricing and reliability, allowing drivers to choose their charging options based on power output and amenities rather than brand loyalty. This unique mix positions Ardmore as a strategic charging hub within the region.

Ardmore charging by the numbers

Locations
10
Chargers
38
DC Fast locations
4
Level 2 locations
6

DC fast share: 40% of locations. Level 2 share: 60%. Average chargers per site: 3.8. Average DC fast power: 268 kW.

Ardmore charging — local snapshot

Top operator share
Blink Network runs 30% of public locations across 6 networks.
Average DC fast power
268 kW (fastest stall: 350 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
40% DC fast / 60% Level 2 across 10 locations
Estimated DC ports
28 fast-charging ports city-wide

Charging networks in Ardmore

The following operators run public charging in Ardmore, ranked by number of locations.

Featured charging locations in Ardmore

A selection of higher-power public charging locations across Ardmore, sorted by power level.

  1. Flying J 701 — Ardmore, OK, 73401 (eVgo Network · DC Fast · 350 kW)
  2. Walmart 129 (Ardmore, OK) — Ardmore, OK, 73401 (Electrify America · DC Fast · 350 kW)
  3. Interurban Classic Grill - Tesla Supercharger — Ardmore, OK, 73401 (Tesla · DC Fast · 250 kW)
  4. Carter County Hyundai — Ardmore, OK, 73401 (Blink Network · DC Fast · 120 kW)
  5. Holiday Inn Express — Ardmore, OK, 73401 (Blink Network · Level 2 · 17.3 kW)
  6. La Quinta Inn — Ardmore, OK, 73401 (Blink Network · Level 2 · 17.3 kW)
  7. Best Western Plus Ardmore Inn & Suites - Tesla Destination — Ardmore, OK, 73401 (Tesla Destination · Level 2 · 7.2 kW)
  8. Dutro Nissan — Ardmore, OK, 73401 (Non-Networked · Level 2 · 7.2 kW)
  9. Billingsley Ford of Ardmore — Ardmore, OK, 73401 (Non-Networked · Level 2 · 7.2 kW)
  10. Best Western Ardmore - Tesla Destination — Ardmore, OK, 73401 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Oklahoma we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Ardmore specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Ardmore, Oklahoma?
There are 10 public electric vehicle charging locations in Ardmore, Oklahoma, with a combined 38 individual chargers. 4 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Ardmore?
Blink Network operates the most public charging locations in Ardmore with 3 sites, followed by Tesla Destination with 2 sites.
How much does it cost to install an EV charger in Ardmore?
Level 2 EV chargers in Ardmore typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Ardmore?
Most Ardmore projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Oklahoma state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Ardmore?
A typical commercial Level 2 installation in Ardmore energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Ardmore take to become profitable?
Payback in Ardmore depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage