Install EV Chargers in Stillwater, Oklahoma

Install EV chargers or analyze a site in Stillwater, Oklahoma. 10 existing public charging locations (7 DC fast, 3 Level 2). Free 0–100 profitability score on any Stillwater address from EV Data Map by Charge Rigs.

Stillwater, Oklahoma is served by 10 public electric vehicle charging locations operating 43 individual chargers — an average of 4.3 chargers per site. Of those locations, 7 (70%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 3 (30%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Stillwater is FCN with 4 locations, followed by EV Connect with 2. Average DC fast power across the city is approximately 145 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Stillwater and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Stillwater

Stillwater, Oklahoma, showcases a dynamic public charging landscape characterized by a competitive array of six distinct charging operators across ten locations, with FCN leading at 40%. The concentration of DC fast chargers—70% of total sites, with an average power output of 145 kW—positions the city to cater effectively to the needs of electric vehicle drivers seeking rapid charging solutions. Notably, nearly half of these fast charging locations offer 150 kW-class power or higher, ensuring drivers can prioritize their charging experience based on speed and convenience. This diverse charging network not only fosters competitive pricing but also allows EV users to select charging stations based on specific power and amenity preferences, enhancing the overall accessibility of electric vehicle infrastructure in Stillwater.

Stillwater charging by the numbers

Locations
10
Chargers
43
DC Fast locations
7
Level 2 locations
3

DC fast share: 70% of locations. Level 2 share: 30%. Average chargers per site: 4.3. Average DC fast power: 145 kW.

Stillwater charging — local snapshot

Top operator share
FCN runs 40% of public locations across 6 networks.
Average DC fast power
145 kW (fastest stall: 325 kW)
High-power share
43% of DC fast sites are 150 kW-class or higher
Mix
70% DC fast / 30% Level 2 across 10 locations
Estimated DC ports
30 fast-charging ports city-wide

Charging networks in Stillwater

The following operators run public charging in Stillwater, ranked by number of locations.

Featured charging locations in Stillwater

A selection of higher-power public charging locations across Stillwater, sorted by power level.

  1. Stillwater Public Library - Tesla Supercharger (Francis Energy) — Stillwater, OK, 74074 (Tesla · DC Fast · 325 kW)
  2. Strickland Park — Stillwater, OK, 74056 (FCN · DC Fast · 201 kW)
  3. Bill Knight Ford Stillwater — Stillwater, OK, 74074 (FCN · DC Fast · 150 kW)
  4. Wilson Buick GMC Cadillac — Stillwater, OK, 74074 (EV Connect · DC Fast · 120 kW)
  5. Wilson Chevrolet — Stillwater, OK, 74074 (EV Connect · DC Fast · 120 kW)
  6. Stillwater Library — Stillwater, OK, 74074 (FCN · DC Fast · 50 kW)
  7. Boomer Lake West - Stillwater — Stillwater, OK, 74075 (FCN · DC Fast · 50 kW)
  8. Central Electric Co-Op Headquarters — Stillwater, OK, 74074 (Non-Networked · Level 2 · 7.2 kW)
  9. Home2 Suites Stillwater - Tesla Destination — Stillwater, OK, 74074 (Tesla Destination · Level 2 · 7.2 kW)
  10. INNOV POINTE CENTRAL ELECT — Stillwater, OK, 74074 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Oklahoma we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Stillwater specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 3 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Stillwater, Oklahoma?
There are 10 public electric vehicle charging locations in Stillwater, Oklahoma, with a combined 43 individual chargers. 7 locations offer DC fast charging and 3 provide Level 2 charging.
What is the largest EV charging network in Stillwater?
FCN operates the most public charging locations in Stillwater with 4 sites, followed by EV Connect with 2 sites.
How much does it cost to install an EV charger in Stillwater?
Level 2 EV chargers in Stillwater typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Stillwater?
Most Stillwater projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Oklahoma state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Stillwater?
A typical commercial Level 2 installation in Stillwater energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Stillwater take to become profitable?
Payback in Stillwater depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage